1. Project Title : Master Node Design for Wireless Body Area Network (WBAN)
Sponsoring Agency : SCSTE, Meghalaya
PI : Dr. Ksh Milan Singh
Sanction Amount : 99,960.00
Financial year of Sanction : 2019-2020
Duration : 1 year
Status : Completed
2. Project Title : Development of electric carrier to transport the goods in rural Hilly Area
Sponsoring Agency : SCSTE, Meghalaya
PI : Dr. Rakesh Roy
Sanction Amount : 1,00,000.00
Financial year of Sanction : 2019-2020
Duration : 1 year
Status : Completed
3. Project Title : Design & Development of High frequency Multilevel Resonant Inverter based New Generation Induction Heated Autoclave System for Sterilization of Surgical Instrumentssponsored by MEitY, Govt. of India under NaMPET-III
Sponsoring Agency : Meity
PI : Dr. Atanu Banerjee
Sanction Amount : 25,00,000.00
Financial year of Sanction : 2019-2020
Duration : 2 years
Status : Ongoing
4. Project Title : Non-contact method of vibration as well as velocity parametres estimation based on goertzel algorithm in PLL Technique
Sponsoring Agency : SERB-DST
PI : Dr. Ksh Milan Singh
Sanction Amount : 30,18,000.00
Financial year of Sanction : 2018-2019
Duration : 3 years
Status : Ongoing
5. Project Title : Real Time Control and Energy management for Seamless Operation of DC Microgrid in Grid - Connected and stand Alone
Sponsoring Agency : SERB-DST
PI : Prof. Gayadhar Panda
Sanction Amount : 44,56,450.00
Financial year of Sanction : 2018-2019
Duration : 3 years
Status : Ongoing
6. Project Title : Design & Development of a Cost- effective & Energy- efficient Grid- connected Pumped Hydro System employed with Sensor-less PMBLDCM
Sponsoring Agency : CPRI
PI : Dr. Atanu Banerjee
Sanction Amount : 32,90,000.00
Financial year of Sanction : 2018-2019
Duration : 2 years
Status : Completed
7. Project Title : Investigation of Dielectric Properties towards assessment of cros-linked Ployethylene (XLPE) Cable Insulation using Dielectric Response Analysis
Sponsoring Agency : SERB-DST
PI : Dr. Supriyo Das
Sanction Amount : 32,40,072.00
Financial year of Sanction : 2017-2018
Duration : 3 years
Status : Completed
8. Project Title : Provision of Frequency Regulation using V2G Control and HVDC transmission Links with Virtual Synchronous Power concept
Sponsoring Agency : SERB-DST
PI : Dr. Sanjoy Debbarma
Sanction Amount : 10,00,000.00
Financial year of Sanction : 2016-2017
Duration : 2 years
Status : Completed
9. Project Title : Synchrophasor Sensing and Seamless Control of Smart Distribution Network with Renewable Energy Integration
Sponsoring Agency : RECTPCL
PI : Prof. Gayadhar Panda
Sanction Amount : 1,31,75,000.00
Financial year of Sanction : 2016-2017
Duration : 3 years
Status : Ongoing
10. Project Title : Design & development of an intelligent controller for a Vienna Rectifier based grid-connected hybrid energy conversion system comprising of wind & solar energy sources.
Sponsoring Agency : SERB-DST
PI : Dr. Atanu Banerjee
Sanction Amount : 32,77,560.00
Financial year of Sanction : 2016-2017
Duration : 3 years
Status : Completed
11. Project Title : Design and development of DSP / FPGA based digital controller for hybrid active power filter applied to Industrial non-linear loads in distribution system.
Sponsoring Agency : SERB-DST
PI : Prof. Gayadhar Panda
Sanction Amount : 22,98,000.00
Financial year of Sanction : 2011-2012
Duration : 3 years
Status : Completed
1. Project Title : Vetting of DPR for construction of 132 KV MLHEP-1 Mustem grid subsation S/C line on D/C tower for redundant transmission corridor for evacuation of generation from MLHEP-1, 3x42 MW power station
Sponsoring Agency : Meghalaya Power Transmission Corporation Limited O
PI : Dr. Sanjoy Debbarma
Dr. Shaik Affijulla
Sanction Amount : 5066385
Financial year of Sanction : 2025-2026
Duration :
Status : Ongoing
2. Project Title : Design and Development of 1Kw commercial Door operator (CDO) and Fire Door Operator (FDO) DC Drive
Sponsoring Agency : CastNx private Limited
PI : Permandra kumar Pardhi
Sanction Amount : 174994
Financial year of Sanction : 2025-2026
Duration :
Status : Ongoing
3. Project Title : Re- conductoring & ; Strengthening of the 132 Kv S/c Transmission Line by HTLS conductor and Restringing of 132 kv S/C Transmission Line with ACSR panther conductor Under MePTCL Meghalaya
Sponsoring Agency : Meghalaya Power Transmission Corporation Limited,S
PI : Dr. Sanjoy Debbarma
Sanction Amount : 3924975
Financial year of Sanction : 2025-2026
Duration :
Status : Ongoing
4. Project Title : Testing of 5 HP Electric Motors- Chaff Cutter and Feed Pellet Maker
Sponsoring Agency : Meghalaya Basin Management Agency, Lower Nogrim Hi
PI : Dr. Shaik Affijulla
Sanction Amount : 7965
Financial year of Sanction : 2024-2025
Duration :
Status : Completed
5. Project Title : Harmonic Study and Appropriate Remedial Measures for Industrial Distribution System
Sponsoring Agency : Star Cement Limited Lumshnong, East Jaintia Hills
PI : Prof. Gayadhar Panda
Sanction Amount : 896800
Financial year of Sanction : 2023-2024
Duration :
Status : Completed
6. Project Title : Testing of Power Transfomer Oil Samples
Sponsoring Agency : Star Cement Limited Lumshnong, East Jaintia Hills
PI : Prof. Gayadhar Panda
Sanction Amount : 37170
Financial year of Sanction : 2023-2024
Duration :
Status : Ongoing
7. Project Title : Harmonic Study and Appropriate Remedial Measures for Industrial Distribution System
Sponsoring Agency : Star Cement Limited Lumshnong, East Jaintia Hills
PI : Prof. Gayadhar Panda
Sanction Amount : 896800
Financial year of Sanction :
Duration :
Status : Completed