Sl. No. | Title of Project | Funding Agency | Sanction Amount | PI & CO PI | StartYr/EndYr/Duration | Remarks |
1 | Mix design & testing of building materials for construction of building at NIT Sohra | RITES Ltd. Gurgoan | 1,11,237.00 | Dr. C. Marthong & Dr. D.K Sarma | 19.12.2014 | Completed |
2 | Mix design of M25/ M30/ M35 for RITES for construction of NITM Sohra | RITES Ltd. Gurgoan | 1,01,124.00 | Dr. C. Marthong & Dr. D.K Sarma | 27.01.2015 | Completed |
3 | Vetting of Str. Drawing of the proposed Construction of St. Edmund Hr. Sec. School Shillong | Chriastian Brother's Institution Shillong | 1,65,000.00 | Dr. C. Marthong | 27.01.2015 | Completed |
4 | Testing of construction materials for NEEPCO Ltd, Shillong | NEEPCO Ltd. Shillong | 3,000.00 | Dr. C. Marthong | 24.02.2015 | Completed |
5 | Third quality control for IIM construction CPWD, Shillong | CPWD Shillong | 2,26,452.00 | Dr. C. Marthong & Dr. D.K Sarma | 20.02.2015 | Completed |
6 | Testing of angle section and barbed for providing overhanging wire fencing at Shillong Airport | Airport Aurhority of India, Shillong | 15,000.00 | Dr. C. Marthong & Dr. D.K Sarma | 24.03.2015 | Completed |
7 | Testing of Concrete cubes and construction materials | CPWD Shillong | 9,000.00 | Dr. C. Marthong | 15.07. 2015 | Completed |
8 | Testing of construction materials for NEEPCO Ltd, Shillong | NEEPCO Ltd. Shillong | 8,500.00 | Dr. C. Marthong | 15.07.2015 | Completed |
9 | Testing of construction materials for IIM Construction, CPWD | CPWD Shillong | 21,500.00 | Dr. C. Marthong | 11.09. 2015 | Completed |
10 | Testing of construction materials Aggregate, bricks for CPWD, IIM Construction | CPWD Shillong | 20,500.00 | Dr. C. Marthong | 21.10.2015 | Completed |
11 | Testing of construction materials for NEEPCO Ltd, Shillong | NEEPCO Ltd. Shillong | 3,000.00 | Dr. C. Marthong | 21.12.2015 | Completed |
12 | Checking Str. Design of Super Care Hospital Building Shillong | Supercare Hospital Shillong | 1,01,900.00 | Dr. C. Marthong | 23.12.2015 | Completed |
13 | Testing of concrete cubes and bricks, CPWD B.D Marbaniang | CPWD Shillong | 13,500.00 | Dr. C. Marthong | 16.12.2015 | Completed |
14 | Testing of cement, CPWD, (P.K) | CPWD Shillong | 34,000.00 | Dr. C. Marthong | 07.01.2016 | Completed |
15 | Testing of cement, Moorum & bitumen for CPWD, Shillong, (P.K) | CPWD Shillong | 49,500.00 | Dr. C. Marthong | 15.02.2016 | Completed |
16 | Material Testing (brick, aggregate, boulder, railing) CPWD, Shillong ( Shri B.D. Marbaniang) | CPWD Shillong | 1,74,000.00 | Dr. C. Marthong & Dr. D.K Sarma | 04.5.2016 | Completed |
17 | Material Testing (cement, boulder, water, bitumen), CPWD, Shillong, (Shri B.D. Marbaniang) | CPWD Shillong | 42,000.00 | Dr. C. Marthong | 07.4.2016 | Completed |
18 | Material Testing (cement, steel), CPWD, Shillong, (Shri B.D. Marbaniang) | CPWD Shillong | 37,500.00 | Dr. C. Marthong | 23.5.2016 | Completed |
19 | Material Testing (cement, bricks), CPWD, Shillong, (Shri B.D. Marbaniang) | CPWD Shillong | 37,000.00 | Dr. C. Marthong & Dr. M.L.Patton | 17.02.2016 | Completed |
20 | Material Testing CPWD, Shillong, (Shri B.D. Marbaniang) | CPWD Shillong | 32,000.00 | Dr. C. Marthong | 23.06.2016 | Completed |
21 | Structural Assessment of R.C.C roof slab of Sylvan House, Forest Department | Forest Dept. Govt. of Meghalaya | 57,250.00 | Dr. C. Marthong & Dr. M.L.Patton | 13.05.2016 | Completed |
22 | Assessing the strength og college building of Sngap Syiem College, Mawkyrwat | Sngap Syiem College, Mawkyrwat | 55,000.00 | Dr. C. Marthong & Dr. M.L.Patton | 28.04.2016 | Completed |
23 | Testing of concrete cubes, aggregates and bricks for IIM, Shillong, CPWD (B.D Marbaniang) | CPWD Shillong | 39,000.00 | Dr. C. Marthong | 29.12.2015 | Completed |
24 | Testing of AAC Blocks for PWD, Shillong Superlite AAC blocks Industry | Superlite Ltd. Guwahati | 7,000.00 | Dr. C. Marthong | 26.07.2016 | Completed |
25 | Mix design M25 for NERCCDIP project Govt. Of Meghalaya (Shri B.D. Marbaniang) | ADB-PWD, Meghalaya | 34,500.00 | Dr. C. Marthong | 05.08.2016 | Completed |
26 | Testing of construction materials for IIM Shillong project (Shri B.D. Marbaniang) | CPWD Shillong | 1,66,000.00 | Dr. C. Marthong and Dr. D.K.Sarma | 11.08.2016 | Completed |
27 | Third party quality control for CPWD constructions | CPWD Shillong | 2,04,836.00 | Dr. C. Marthong and D.K.Sarma | 18.07.2018 | Completed |
28 | Third party quality control for CPWD constructions | CPWD Shillong | 1,34,472.00 | Dr. C. Marthong and Dr. D.K.Sarma | 28.07.2016 | Completed |
29 | Testing of construction materials and performing mix design M25 for Power Grid Coorporation Limited | Power Grid, Shillong | 70,500.00 | Dr. C. Marthong | 30.08.2016 | Completed |
30 | Testing of construction materials for construction of CMD's residence for NEEPCO at laitkor, Shillong | NEEPCO Ltd. Shillong | 28,500.00 | Dr. C. Marthong | 07.09.2016 | Completed |
31 | Testing of AAC Blocks for PWD, Shillong Powerlite Industries | Powerlite Ltd. Guwahati | 8,050.00 | Dr. C. Marthong | 07.09.2016 | Completed |
32 | Testing of material for Power Grid Corporation Limited supplier by NECCON Power & Infra Limited, Shillong | Power Grid, Shillong | 17,500.00 | Dr. C. Marthong | 14.09.2016 | Completed |
33 | Testing of materials for CPWD, Shillong for construction of IIM, Shillong | CPWD Shillong | 24,150.00 | Dr. C. Marthong and Dr. D.K.Sarma | 14.09.2016 | Completed |
34 | Testing of material for Power Grid Corporation Limited supplier by NECCON Power & Infra Limited, Shillong | Power Grid, Shillong | 24,150.00 | Dr. C. Marthong | 15.09.2016 | Completed |
35 | Testing of material for Power Grid Corporation Limited supplier by NECCON Power & Infra Limited, Shillong | Power Grid, Shillong | 40,825.00 | Dr. C. Marthong | 26.09.2016 | Completed |
36 | Testing of material for Power Grid Corporation Limited supplier by NECCON Power & Infra Limited, Shillong | Power Grid, Shillong | 3,050.00 | Dr. C. Marthong | 5.10.2016 | Completed |
37 | Testing of material for Power Grid Corporation Limited supplier by NECCON Power & Infra Limited, Shillong | Power Grid, Shillong | 33,350.00 | Dr. C. Marthong | 18.10.2016 | Completed |
38 | Testing of construction materials for NEEPCO Ltd, Shillong | CPWD Shillong | 31,500.00 | Dr. C. Marthong | 18.10.2016 | Completed |
39 | Testing of concrete cubes, aggregates and bricks for IIM, Shillong, CPWD (B.D Marbaniang) | CPWD Shillong | 2,34,000.00 | Dr. C. Marthong | 19.10.2016 | Completed |
40 | Third quality control for IIM construction CPWD, Shillong | CPWD Shillong | 1,53,186.00 | Dr. C. Marthong & Dr. D.K Sarma | 19.10.2016 | Completed |
41 | Third quality control for IIM construction CPWD, Shillong | CPWD Shillong | 1,69,198.00 | Dr. C. Marthong & Dr. D.K Sarma | 19.10.2016 | Completed |
42 | Structural vetting for NRL, Assam | NRL, Assam | 34,500.00 | Dr. C. Marthong & Dr. M.L.Patton | 26.10.2016 | Completed |
43 | Testing of concrete cubes, aggregates and bricks for IIM, Shillong, CPWD (B.D Marbaniang) | CPWD Shillong | 60,500.00 | Dr. C. Marthong | 28.10.2016 | Completed |
44 | Testing of materials for IIMPD. CPWD (B.D Marbaniang) | CPWD Shillong | 1,52,000.00 | Dr. C. Marthong | 01.12.2016 | Completed |
45 | Material testing for power Grid | Power Grid, Shillong | 10,350.00 | Dr. C. Marthong and Dr. S. Sharma | 22.11.2016 | Completed |
46 | Material testing for power Grid | Power Grid, Shillong | 32,200.00 | Dr. C. Marthong | 18.11.2016 | Completed |
47 | Structural Design for AF, (HQ), Shillong Zone | Indian Airforce, Shillong | 4,12,399.00 | Dr. C. Marthong & Dr. M.L.Patton | 01.09.2016 | Completed |
48 | Conducting Mix Design M25 grade for power grid, Teok S/S | Power Grid, Shillong | 34,500.00 | Dr. C. Marthong | 23.12.2016 | Completed |
49 | Conducting Mix Design M25 grade for power grid, Behiding S/S | Power Grid, Shillong | 34,500.00 | Dr. C. Marthong | 23.12.2016 | Completed |
50 | Conducting Mix Design M25 grade for power grid, Sonapur S/S | Power Grid, Shillong | 34,500.00 | Dr. C. Marthong | 23.12.2016 | Completed |
51 | Examination/ Vetting of the structural drawings of Shri R.L Sharma, Jailroad | Power Grid, Shillong | 1,11,000.00 | Dr. C. Marthong | 27.12.2016 | Completed |
52 | Conducting Mix design M25 grade for Power Grid, NERPSIP for S/S | Power Grid, Shillong | 34,500.00 | Dr. C. Marthong | 21.12.2016 | Completed |
53 | Conducting Mix design M25 grade for Power Grid,Mynkre S/S (NERPSIP) | Power Grid, Shillong | 34,500.00 | Dr. C. Marthong | 21.12.2016 | Completed |
54 | Material Testing ( Aggregate) For Power Grid | Power Grid, Shillong | 14,950.00 | Dr. C. Marthong | 04.01.2017 | Completed |
55 | Material Testing (Boulder) For CPWD, IIMPD, Shillong No. Camp/AE-1/ IIMPD/ 2016-17/ 01 dt 03.10.16 | Power Grid, Shillong | 74,750.00 | Dr. C. Marthong | 04.01.2017 | Completed |
56 | Material Testing (Stone Boulder) For CPWD, IIMPD, Shillong No. Camp/AE-1/ IIMPD/ 2016-17/ 01 dt 29.11.16 | CPWD Shillong | 74,750.00 | Dr. C. Marthong | 04.01.2017 | Completed |
57 | Material Testing ( Aggregate & Stone) For CPWD, IIMPD, Shillong | CPWD Shillong | 90,850.00 | Dr. C. Marthong | 04.01.2017 | Completed |
58 | Testing of Steel bars for CPWD, Shillong, IIMPD, Shillong | CPWD Shillong | 54,050.00 | Dr. C. Marthong | 04.01.2017 | Completed |
59 | Testing of Construction Material( Cement, Water, Concrete cubes) for CPWD, Shillong- IIM, Shillong project | CPWD Shillong | 55,200.00 | Dr. C. Marthong & Dr. S. Sharma | 04.01.2017 | Completed |
60 | Material Testing ( Steel) for CPWD, Shillong, IIMPD, Shillong | CPWD Shillong | 64,975.00 | Dr. C. Marthong & Dr. D.K. Sarma | 04.01.2017 | Completed |
61 | Material Testing (Bitumen) for CPWD, Shillong, IIMPD, Shillong | CPWD Shillong | 63,250.00 | Dr. C. Marthong | 04.01.2017 | Completed |
62 | Testing of construction materials( Stone Boulder, Bricks and Water) for CPWD, Shillong- IIMPD Project | CPWD Shillong | 89,700.00 | Dr. C. Marthong & Dr. S.Sharma | 04.01.2017 | Completed |
63 | Material Testing ( Stone Boulder) for CPWD, Shillong, IIMPD Boulder: 23(1)/AE-1/IIMPD/SH/ 2015-16/06 dt 28/05/2015 8 sample | CPWD Shillong | 59,800.00 | Dr. C. Marthong | 04.01.2017 | Completed |
64 | Testing of Material ( Stone Boulder) for CPWD, Shillong, IIMPD Boulder: 23(1)/AE-1/IIMPD/SH/ 2014-15/09 dt 26/05/2015 8 sample | Power Grid, Shillong | 59,800.00 | Dr. C. Marthong | 04.01.2017 | Completed |
65 | Testing of construction material for Power Grid Corporation India ltd. | Power Grid, Shillong | 14,950.00 | Dr. C. Marthong | 20.01.2017 | Completed |
66 | Testing of construction material for CPWD, Shillong | CPWD Shillong | 94,300.00 | Dr. C. Marthong | 20.01.2017 | Completed |
67 | Testing of construction material for CPWD, Shillong | Power Grid, Shillong | 58,650.00 | Dr. C. Marthong | 20.01.2017 | Completed |
68 | Testing of water for Power Grid Corporation India | Power Grid, Shillong | 5,750.00 | Dr. C. Marthong & Dr. S. Sharma | 03.02.2017 | Completed |
69 | Testing of water quality for Power Grid Corporation India | Power Grid, Shillong | 10,350.00 | Dr. C. Marthong & Dr. S. Sharma | 03.02.2017 | Completed |
70 | Testing of construction material and water for Power Grid Corporation India | Power Grid, Shillong | 15,525.00 | Dr. C. Marthong | 03.02.2017 | Completed |
71 | Testing of Cement for CPWD, Shillong | Power Grid, Shillong | 29,325.00 | Dr. C. Marthong | 13.02.2017 | Completed |
72 | Testing of Bricks for Power Grid Corporation India Ltd | Power Grid, Shillong | 12,650.00 | Dr. C. Marthong | 15.02.2017 | Completed |
73 | Construction for pile foundation of 132KV Pasighat- Roing- Tezu- Namsai transmission line | Power Grid, Shillong | 75,660.00 | Dr. C. Marthong and Dr. D.K.Sarma | 27.02.2017 | Completed |
74 | Comstruction of Mawkynrew 33/11KV Substation under NERPSIP, Meghalaya | Power Grid, Shillong | 9,775.00 | Dr. C. Marthong | 27.02.2017 | Completed |
75 | Construction of Boundary wall at Proposed NEEPCO Township, Mawdiangdiang, Shillong | NEEPCO Ltd. Shillong | 3,450.00 | Dr. C. Marthong | 27.02.2017 | Completed |
76 | Velting of Structural Design of MES Buildings | MES, Shillong | 50,000.00 | Dr. C. Marthong | 20.02.2017 | Completed |
77 | Testing of water sample for Power Grid Corporation India Ltd | Power Grid, Shillong | 5,750.00 | Dr. C. Marthong & Dr. S. Sharma | 15.03.2017 | Completed |
78 | Testing of water sample and cement cubes for Power Grid Corporation India Ltd | Power Grid, Shillong | 10,925.00 | Dr. C. Marthong & Dr. S. Sharma | 15.03.2017 | Completed |
79 | Testing of concrete cubes for Construction of Lady Keane College | Lady Keane College, Shillong | 1,725.00 | Dr. C. Marthong | 19.03.2017 | Completed |
80 | Testing of Construction Material (Cement, Boulders & Bricks) for construction of Retaining wall behind Academic Block A | CPWD Shillong | 1,30,525.00 | Dr. C. Marthong & Dr. M.L.Patton | 22.03.2017 | Completed |
81 | Material Testing (cement, bricks, stone & water) for construction of additional landfill and Ancillary work at Marten, Shillong | MPWD Shillong | 22,425.00 | Dr. C. Marthong & Dr. S. Sharma | 15.03.2017 | Completed |
82 | Material testing (Stone, cubes & water) for development of RGIIM campus Shillong | CPWD Shillong | 90,850.00 | Dr. C. Marthong & Dr. S. Sharma | 25.03.2017 | Completed |
83 | Material testing (Steel & cement) for development of RGIIM, campus at Shillong | CPWD Shillong | 73,600.00 | Dr. C. Marthong & Dr. S. Sharma | 27.03.2017 | Completed |
84 | Testing of Concrete Cubes, water & Boulder for construction of new 33/11 KV Mynkre and 33/11 KV Rymbai Substation under NERPSIP Scheme Meghalaya | Power Grid, Shillong | 24,725.00 | Dr. C. Marthong & Dr. S. Sharma | 31.03.2017 | Completed |
85 | testing of Cubes cement for pile foundation of 132 Pasighat- Roing- Tezu- Namsai transmission line | Power Grid, Shillong | 23,000.00 | Dr. C. Marthong & Dr. M.L.Patton | 31.03.2017 | Completed |
86 | Construction of 33/11 KV Rymbai Substation under NERPSIP, Meghalaya | Power Grid, Shillong | 13,800.00 | Dr. C. Marthong | 10.04.2017 | Completed |
87 | Construction work of 33/11 KV New Shillong Substation under NERPSIP Scheme Meghalaya | Power Grid, Shillong | 90,200.00 | Dr. C. Marthong & Dr. S. Sharma | 10.04.2017 | Completed |
88 | Construction of Road, i/c retaining walls site grading and preparation for proposed state of Art Academic cum residential campus of RGIIM at Umsawli, Shillong (Phase- I) | CPWD Shillong | 74,750.00 | Dr. C. Marthong & Dr. M.L.Patton | 10.04.2017 | Completed |
89 | Construction of Road, i/c retaining walls site grading and preparation for proposed state of Art Academic cum residential campus of RGIIM at Umsawli, Shillong (Phase- I) | CPWD Shillong | 74,750.00 | Dr. C. Marthong | 10.04.2017 | Completed |
90 | Construction of Road, i/c retaining walls site grading and preparation for proposed state of Art Academic cum residential campus of RGIIM at Umsawli, Shillong (Phase- I) | CPWD Shillong | 74,750.00 | Dr. C. Marthong | 10.04.2017 | Completed |
91 | Construction of Road, i/c retaining walls site grading and preparation for proposed state of Art Academic cum residential campus of RGIIM at Umsawli, Shillong (Phase- I) | CPWD Shillong | 74,750.00 | Dr. C. Marthong & Dr. M.L.Patton | 10.04.2017 | Completed |
92 | Construction of Road, i/c retaining walls site grading and preparation for proposed state of Art Academic cum residential campus of RGIIM at Umsawli, Shillong (Phase- I) | CPWD Shillong | 74,750.00 | Dr. C. Marthong | 10.04.2017 | Completed |
93 | Construction of Road, i/c retaining walls site grading and preparation for proposed state of Art Academic cum residential campus of RGIIM at Umsawli, Shillong (Phase- I) | CPWD Shillong | 74,750.00 | Dr. C. Marthong | 10.04.2017 | Completed |
94 | Construction of Road, i/c retaining walls site grading and preparation for proposed state of Art Academic cum residential campus of RGIIM at Umsawli, Shillong (Phase- I) | CPWD Shillong | 74,750.00 | Dr. C. Marthong & Dr. M.L.Patton | 10.04.2017 | Completed |
95 | Construction of Road, i/c retaining walls site grading and preparation for proposed state of Art Academic cum residential campus of RGIIM at Umsawli, Shillong (Phase- I) | CPWD Shillong | 74,750.00 | Dr. C. Marthong | 10.04.2017 | Completed |
96 | Construction of Road, i/c retaining walls site grading and preparation for proposed state of Art Academic cum residential campus of RGIIM at Umsawli, Shillong (Phase- I) | CPWD Shillong | 74,750.00 | Dr. C. Marthong | 10.04.2017 | Completed |
97 | Construction of Road, i/c retaining walls site grading and preparation for proposed state of Art Academic cum residential campus of RGIIM at Umsawli, Shillong (Phase- I) | CPWD Shillong | 52,350.00 | Dr. C. Marthong & Dr. M.L.Patton | 10.04.2027 | Completed |
98 | Construction of Road, i/c retaining walls site grading and preparation for proposed state of Art Academic cum residential campus of RGIIM at Umsawli, Shillong (Phase- I) | CPWD Shillong | 74,750.00 | Dr. C. Marthong | 10.04.2017 | Completed |
99 | Construction of Road, i/c retaining walls site grading and preparation for proposed state of Art Academic cum residential campus of RGIIM at Umsawli, Shillong (Phase- I) | CPWD Shillong | 74,750.00 | Dr. C. Marthong | 10.04.2017 | Completed |
100 | Construction of Road, i/c retaining walls site grading and preparation for proposed state of Art Academic cum residential campus of RGIIM at Umsawli, Shillong (Phase- I) | CPWD Shillong | 74,750.00 | Dr. C. Marthong & Dr. M.L.Patton | 10.04.2017 | Completed |
101 | Construction of Road, i/c retaining walls site grading and preparation for proposed state of Art Academic cum residential campus of RGIIM at Umsawli, Shillong (Phase- I) | CPWD Shillong | 74,750.00 | Dr. C. Marthong | 10.04.2017 | Completed |
102 | Construction of Road, i/c retaining walls site grading and preparation for proposed state of Art Academic cum residential campus of RGIIM at Umsawli, Shillong (Phase- I) | CPWD Shillong | 74,750.00 | Dr. C. Marthong | 10.04.2017 | Completed |
103 | Construction of Road, i/c retaining walls site grading and preparation for proposed state of Art Academic cum residential campus of RGIIM at Umsawli, Shillong (Phase- I) | CPWD Shillong | 74,750.00 | Dr. C. Marthong & Dr. M.L.Patton | 10.04.2017 | Completed |
104 | Construction of Road, i/c retaining walls site grading and preparation for proposed state of Art Academic cum residential campus of RGIIM at Umsawli, Shillong (Phase- I) | CPWD Shillong | 74,750.00 | Dr. C. Marthong | 10.04.2017 | Completed |
105 | Construction of Road, i/c retaining walls site grading and preparation for proposed state of Art Academic cum residential campus of RGIIM at Umsawli, Shillong (Phase- I) | CPWD Shillong | 74,750.00 | Dr. C. Marthong | 10.04.2017 | Completed |
106 | Construction of Road, i/c retaining walls site grading and preparation for proposed state of Art Academic cum residential campus of RGIIM at Umsawli, Shillong (Phase- I) | CPWD Shillong | 74,750.00 | Dr. C. Marthong | 10.04.2017 | Completed |
107 | Construction of Road, i/c retaining walls site grading and preparation for proposed state of Art Academic cum residential campus of RGIIM at Umsawli, Shillong (Phase- I) | CPWD Shillong | 74,750.00 | Dr. C. Marthong & Dr. M.L.Patton | 10.04.2017 | Completed |
108 | Construction of Road, i/c retaining walls site grading and preparation for proposed state of Art Academic cum residential campus of RGIIM at Umsawli, Shillong (Phase- I) | CPWD Shillong | 74,750.00 | Dr. C. Marthong | 10.04.2017 | Completed |
109 | Construction of Road, i/c retaining walls site grading and preparation for proposed state of Art Academic cum residential campus of RGIIM at Umsawli, Shillong (Phase- I) | CPWD Shillong | 74,750.00 | Dr. C. Marthong | 10.04.2017 | Completed |
110 | Construction of Road, i/c retaining walls site grading and preparation for proposed state of Art Academic cum residential campus of RGIIM at Umsawli, Shillong (Phase- I) | CPWD Shillong | 74,750.00 | Dr. C. Marthong | 10.04.2017 | Completed |
111 | Design of steel building located at Shillong for Neil Sootinck | M/S Neil Sootinck Suting, Shillong | 80,500.00 | Dr. D. Podder Dr. M.L.Patton & Dr. C. Marthong | 22.05.2017 | Completed |
112 | Testing of Cement for CPWD, Shillong | CPWD Shillong | 48,875.00 | Dr. C. Marthong | 22.05.2017 | Completed |
113 | Testing of bricks & Cement cubes | CPWD Shillong | 15,525.00 | Dr. C. Marthong & Dr. M.L.Patton | 22.05.2017 | Completed |
114 | Conducting Mix design NERCCDIIP, Shillong | Power Grid Shillong | 34,500.00 | Dr. C. Marthong | 22.05.2017 | Completed |
115 | Testing of boulder for CPWD, Shillong | CPWD Shillong | 74,750.00 | Dr. C. Marthong | 22.05.2017 | Completed |
116 | Testing of concrete cubes, CPWD | CPWD Shillong | 3,450.00 | Dr. C. Marthong | 22.05.2017 | Completed |
117 | Testing of concrete cubes, CPWD | CPWD Shillong | 17,250.00 | Dr. C. Marthong | 05.06.2017 | Completed |
118 | Testing of concrete cubes, CPWD | CPWD Shillong | 17,250.00 | Dr. C. Marthong | 05.06.2017 | Completed |
119 | Testing of concrete cubes, CPWD | CPWD Shillong | 17,250.00 | Dr. C. Marthong | 05.06.2017 | Completed |
120 | Testing of concrete cubes, PWD | ADB-PWD, Meghalaya | 17,250.00 | Dr. C. Marthong | 05.06.2017 | Completed |
121 | Testing of concrete cubes, PWD | ADB-PWD, Meghalaya | 10,500.00 | Dr. C. Marthong | 06.06.2017 | Completed |
122 | Testing of concrete cubes, PWD | ADB-PWD, Meghalaya | 10,500.00 | Dr. C. Marthong | 06.06.2017 | Completed |
123 | Testing of concrete cubes, CPWD | CPWD Shillong | 10,500.00 | Dr. C. Marthong | 06.06.2017 | Completed |
124 | Testing of concrete cubes, CPWD | CPWD Shillong | 10,500.00 | Dr. C. Marthong | 06.06.2017 | Completed |
125 | Testing of Construction Materials | Indian Airforce, Shillong | 25,000.00 | Dr. C. Marthong | 06.06.2017 | Completed |
126 | Velting of Structural Design & Drawing for N.F. Railway building, Agartala | N.F.Railway Agartala | 10,000.00 | Dr. C. Marthong & Dr. M.L.Patton | 07.06.2017 | Completed |
127 | Testing of cement for SIPMIU. Project Shillong | MPWD Shillong | 9,775.00 | Dr. C. Marthong | 15.06.2017 | Completed |
128 | Testing of Construction Materials | CPWD Shillong | 20,700.00 | Dr. C. Marthong | 15.06.2017 | Completed |
129 | Testing of Construction Materials for SIPMIU, Meghalaya | MPWD Shillong | 17,250.00 | Dr. C. Marthong | 15.06.2017 | Completed |
130 | Testing of bricks, soil, cubes for Power Grid Shillong | Power Grid, Shillong | 40,825.00 | Dr. C. Marthong & Dr. S. Sharma | 05.07.2017 | Completed |
131 | Testing of boulder/ steel/ water/ cement for CPWD, Shillong | CPWD Shillong | 45,712.00 | Dr. S. Sharma & Dr. C. Marthong | 05.07.2017 | Completed |
132 | Structural design for OTM ACCN for Airforce Shillong | Indian Airforce, Shillong | 7,19,000.00 | Dr. C. Marthong & Dr. M.L.Patton | 05.07.2017 | Completed |
133 | Testing of boulder and metal for CPWD, Shillong | CPWD Shillong | 1,19,025.00 | Dr. C. Marthong | 05.07.2017 | Completed |
134 | Testing of aggregate & cement for CPWD, Shillong | CPWD Shillong | 1,19,025.00 | Dr. C. Marthong | 05.07.2017 | Completed |
135 | Testing of boulder for CPWD, Shillong | CPWD Shillong | 2,99,000.00 | Dr. M.L.Patton & Dr. C. Marthong | 05.07.2017 | Completed |
136 | Testing of Construction Materials for Power Grid Corporation of India Limited | Power Grid Shillong | 31,270.00 | Dr. C. Marthong | 30.08.2017 | Completed |
137 | Testing of Construction Materials for Power Grid Corporation of India Limited | Power Grid Shillong | 15,930.00 | Dr. C. Marthong | 30.08.2017 | Completed |
138 | Testing of Construction Materials for Power Grid Corporation of India Limited | Power Grid Shillong | 14,025.00 | Dr. C. Marthong & Dr. S. Sharma | 30.08.2017 | Completed |
139 | Testing of Construction Materials for Donush Siangshai Educational Trust | M/s Donush Siangshai Educational Trust | 21,800.00 | Dr. C. Marthong & Dr. M.L.Patton | 30.08.2017 | Completed |
140 | Testing of Concrete Cubes | CPWD Shillong | 7,080.00 | Dr. C. Marthong | 06.10.2017 | Completed |
141 | Testing of Concrete Cubes & Boulders for CPWD, Shillong | CPWD Shillong | 89,090.00 | Dr. C. Marthong | 06.10.2017 | Completed |
142 | Testing of construction materials, CPWD | CPWD Shillong | 20,355.00 | Dr. C. Marthong | 25.09.2017 | Completed |
143 | Testing of construction materials RITES Ltd. | RITES Ltd. Shillong | 10,030.00 | Dr. C. Marthong & Dr. M.L.Patton | 27.09.2017 | Completed |
144 | Design and Renovation of Sylvan House, Forest Dept. Govt. of Meghalaya | Forest Dept. Govt. of Meghalaya | 1,01,000.00 | Dr. C. Marthong & Dr. M.L.Patton | 09.10.2017 | Completed |
145 | Design and Estimate for the inclined pitch roof slab roof "Sylvan House Building". | Forest Dept. Govt. of Meghalaya | 1,01,000.00 | Dr. C. Marthong & Dr. M.L.Patton | 07.11.2017 | completed |
146 | Testing of cement for RITES, Sohra | RITES, Sohra | 10,030.00 | Dr. C. Marthong | 07.11.2017 | completed |
147 | Testing of Concrete Cubes ,cement and water for CPWD Shillong. | CPWD Shillong. | 20,355.00 | Dr. C. Marthong & S.Sharma | 07.11.2017 | completed |
148 | Testing of Concrete Cubes ,cement ,coarse agg., fine agg and steel for CPWD Shillong. | CPWD Shillong. | 70,800.00 | Dr. C. Marthong | 07.11.2017 | completed |
149 | Testing of Concrete Cubes and cement for Power Grid Corporation India Ltd,Shillong | Power Grid Corporation India Ltd,Shillong | 27,730.00 | Dr. C. Marthong | 07.11.2017 | completed |
150 | Testing of Concrete Cubes and steel for North East Consultancy Services, Shillong. | North East Consultancy Services, Shillong. | 13,570.00 | Dr. C. Marthong | 07.11.2017 | completed |
151 | Testing of Boulders and Bricks for CPWD Shillong. | CPWD Shillong. | 1,53,530.00 | Dr. C. Marthong | 04.12.2017 | completed |
152 | Testing of cement for CPWD Shillong. | CPWD Shillong. | 20,060.00 | Dr. C. Marthong | 04.12.2017 | completed |
153 | Testing of Pavement materials and GSB mix design for AAI, Shillong. | AAI, Shillong. | 21,500.00 | Dr. C. Marthong & Dr. M.L.Patton | 04.12.2017 | completed |
154 | Testing of Pavement materials and GSB mix design for AAI, Shillong. | AAI, Shillong. | 31,010.00 | Dr. C. Marthong | 04.12.2017 | completed |
155 | Testing of Concrete Cubes and water for Power Grid Corporation India Ltd,Shillong | Power Grid Corporation India Ltd,Shillong | 23,600.00 | Dr. C. Marthong & S.Sharma | 04.12.2017 | completed |
156 | Testing of Concrete Cubes for BD Marbaniang,Shillong | CPWD Shillong. | 5,310.00 | Dr. C. Marthong & Dr. M.L.Patton | 04.12.2017 | completed |
157 | Testing of Concrete Cubes for Power Grid Corporation India Ltd,Shillong | Power Grid Corporation India Ltd,Shillong | 5,310.00 | Dr. C. Marthong | 17.01.2018 | completed |
158 | Testing of AAC blocks for St. Edmund college campus, Shillong. | St. Edmund college campus, Shillong. | 28,085.00 | Dr. C. Marthong | 17.01.2018 | completed |
159 | Testing of Concrete Cubes ,cement ,coarse agg., fine agg and bricks for PGCIL, Shillong. | Power Grid Corporation India Ltd,Shillong | 47,790.00 | Dr. C. Marthong | 17.01.2018 | completed |
160 | Testing of Steel for CPWD Shillong. | CPWD Shillong. | 1,13,280.00 | D.K Sharma | 17.01.2018 | completed |
161 | Testing of Boulders, water and cement for CPWD Shillong. | CPWD Shillong. | 5,44,570.00 | Dr. C. Marthong, S.Sharma & Dr. M.L.Patton | 17.01.2018 | completed |
162 | Testing of Concrete Cubes ,cement , fine agg ,steel, water and bricks for DRDA, west khasi hills district, Shillong. | DRDA, west khasi hills district, Shillong. | 74,930.00 | Dr. C. Marthong & D.k Sharma | 05.02.2018 | completed |
163 | Testing of Concrete Cubes ,cement , fine agg ,steel, water and bricks for DRDA, west khasi hills district, Shillong. | DRDA, west khasi hills district, Shillong. | 74,930.00 | Dr. C. Marthong & D.k Sharma | 05.02.2018 | completed |
164 | Testing of ,cement , fine agg ,coarse agg and water for Blackberry Overseas Put Ltd. | Blackberry Overseas Put Ltd. | 60,700.00 | Dr. C. Marthong | 17.01.2018 | completed |
165 | Testing of Boulders ,water and cement for CPWD Shillong. | CPWD Shillong. | 3,58,130.00 | Dr. C. Marthong, S.Sharma & Dr. M.L.Patton | 17.01.2018 | completed |
166 | Testing of Concrete Cubes and cement for Power Grid Corporation India Ltd,Shillong | Power Grid Corporation India Ltd,Shillong | 33,040.00 | Dr. C. Marthong | 17.01.2018 | completed |
167 | Testing of ,water and cement for CPWD Shillong. | CPWD Shillong. | 6,785.00 | S.Sharma | 17.01.2018 | completed |
168 | Testing of Concrete Cubes and cement for PGCIL, Shillong. | Power Grid Corporation India Ltd,Shillong | 11,800.00 | Dr. C. Marthong | 05.02.2018 | completed |
169 | Testing of Bricks & FLAG for HSCC(India) Ltd NEIGRIHMS | HSCC(India) Ltd NEIGRIHMS | 6,372.00 | Dr. C. Marthong | 26.02.2018 | completed |
170 | Testing of Concrete Cubes,bricks and cement for PGCIL, Shillong. | Power Grid Corporation India Ltd,Shillong | 34,810.00 | Dr. C. Marthong & Dr. M.L.Patton | 01.02.2018 | completed |
171 | Testing of Concrete Cubes for PGCIL, Shillong. | Power Grid Corporation India Ltd,Shillong | 3,540.00 | Dr. C. Marthong | 01.02.2018 | completed |
172 | Testing of Concrete Cubes and steel for PGCIL, Shillong. | Power Grid Corporation India Ltd,Shillong | 37,170.00 | Dr. C. Marthong & D.k Sharma | 14.02.2018 | completed |
173 | Testing of Boulders ,coarse agg. and cement for CPWD Shillong. | Testing of Boulders ,coarse agg. and cement for CPWD Shillong. | 2,05,320.00 | Dr. C. Marthong | 14.02.2018 | completed |
174 | Testing of Boulders for CPWD Shillong. | Testing of Boulders for CPWD Shillong. | 5,75,250.00 | Dr. C. Marthong & Dr. M.L.Patton | 14.02.2018 | completed |
175 | Testing of Concrete Cubes and cement for PGCIL, Shillong. | Power Grid Corporation India Ltd,Shillong | 18,900.00 | Dr. C. Marthong | 14.02.2018 | completed |
176 | Testing of Boulders ,coarse agg. and cement for CPWD Shillong. | CPWD Shillong. | 2,88,514.00 | Dr. C. Marthong & Dr. M.L.Patton | 26.02.2018 | completed |
177 | Testing of Concrete Cubes and cement for PGCIL, Shillong. | Power Grid Corporation India Ltd,Shillong | 22,420.00 | Dr. C. Marthong & Dr. M.L.Patton | 26.02.2018 | completed |
178 | Testing of ,coarse agg., fine agg.,steel ,concrete cubes and cement for NERCC DIP Shillong. | NERCC DIP Shillong. | 73,750.00 | Dr. C. Marthong & D.k Sharma | 06.03.2018 | completed |
179 | Testing of Concrete Cubes,fine agg.,bricks and cement for PGCIL, Shillong. | Power Grid Corporation India Ltd,Shillong | 59,000.00 | Dr. C. Marthong & Dr. M.L.Patton | 06.03.2018 | completed |
180 | Testing of Concrete Cubes for PGCIL, Shillong. | Power Grid Corporation India Ltd,Shillong | 19,470.00 | Dr. C. Marthong | 06.03.2018 | completed |
181 | Testing of Concrete Cubes for PGCIL, Shillong. | Power Grid Corporation India Ltd,Shillong | 17,770.00 | Dr. C. Marthong | 26.03.2018 | completed |
182 | Testing of Boulders ,bricks,concrete cubes and cement for CPWD Shillong. | CPWD Shillong. | 1,91,160.00 | Dr. C. Marthong & S.Sahoo | 26.03.2018 | completed |
183 | Vetting of structural Design and Drawings of the proposed OT complex for Nazareth ,Shillong | Nazareth ,Shillong | 11,800.00 | Dr. C. Marthong | 26.03.2018 | completed |
184 | Vetting of structural Design for Pine Mount International School at Doldegre,Meghalaya. | MPWD Shillong | 23,580.00 | Dr. C. Marthong & Dr. M.L.Patton | 26.03.2018 | completed |
185 | Testing of Boulders ,coarse agg. and cement for CPWD Shillong. | CPWD Shillong | 5,01,500.00 | Dr. C. Marthong & Dr. M.L.Patton | 12.04.2018 | completed |
186 | Testing of Concrete Cubes for PGCIL, Shillong. | Power Grid Corporation India Ltd,Shillong | 10,620.00 | Dr. C. Marthong & S.Sahoo | 12.04.2018 | completed |
187 | Testing of coarse agg.for NCC Kolkata | Testing of coarse agg.for NCC Kolkata | 5,900.00 | Dr. C. Marthong | 12.04.2018 | completed |
188 | Testing of Cement for PGCIL, Shillong. | Testing of Cement for PGCIL, Shillong. | 18,360.00 | Dr. C. Marthong & Dr. M.L.Patton | 12.04.2018 | completed |
189 | Testing of Concrete Cubes and Cement for PGCIL, Shillong. | Power Grid Corporation India Ltd,Shillong | 27,000.00 | Dr. C. Marthong & S.Sahoo | 12.04.2018 | completed |
190 | Testing of Cement for RITESLtd. | RITESLtd. | 20,060.00 | Dr. C. Marthong & Dr. M.L.Patton | 07.05.2018 | completed |
191 | Testing of Concrete Cubes ,Cement and mix design for PGCIL, Shillong. | Power Grid Corporation India Ltd,Shillong | 77,290.00 | Dr. C. Marthong & Dr. M.L.Patton | 07.05.2018 | completed |
192 | Testing of Boulders ,concrete cubes , water. and cement for CPWD Shillong. | CPWD Shillong | 4,33,945.00 | Dr. C. Marthong | 07.05.2018 | completed |
193 | Testing of Cement for RITESLtd. | Testing of Cement for RITESLtd. | 10,030.00 | Dr. C. Marthong & Dr. M.L.Patton | 07.05.2018 | completed |
194 | Structural design of OTM ACCN for ALH SQN (PH-11) at Dinjan Miltary station (Job no: E/1994) | MES Shillong | 6,90,000.00 | Dr. C. Marthong & Dr. M.L.Patton | 07.05.2018 | completed |
195 | Testing of Concrete Cubes for PGCIL, Shillong. | Power Grid Corporation India Ltd,Shillong | 3,540.00 | Dr. C. Marthong | 29.05.2018 | completed |
196 | Testing of Concrete Cubes for PGCIL, Shillong. | Power Grid Corporation India Ltd,Shillong | 12,390.00 | Dr. C. Marthong & Dr. M.L.Patton | 29.05.2018 | completed |
197 | Testing of Concrete Cubes for PGCIL, Shillong. | Power Grid Corporation India Ltd,Shillong | 7,080.00 | Dr. C. Marthong | 29.05.2018 | completed |
198 | Mix design for M/S Blackberry Put Ltd. | M/S Blackberry Put Ltd. | 35,400.00 | Dr. C. Marthong | 29.05.2018 | completed |
199 | Testing of Concrete Cubes ,Cement and bricks for PGCIL, Shillong. | Power Grid Corporation India Ltd,Shillong | 57,820.00 | Dr. C. Marthong & Dr. M.L.Patton | 29.05.2018 | completed |
200 | Testing of Boulders, fine agg. And cement for PGCIL, Shillong. | Power Grid Corporation India Ltd,Shillong | 16,520.00 | Dr. C. Marthong | 29.05.2018 | completed |
201 | Testing of Cement for RITES Ltd. | Testing of Cement for RITES Ltd. | 10,030.00 | Dr. C. Marthong | 28.06.2018 | completed |
202 | Testing of water for CPWD Shillong. | CPWD Shillong | 6,785.00 | S.Sharma | 28.06.2018 | completed |
203 | Testing of Cement for RITES Ltd. | RITES Ltd. | 10,030.00 | Dr. C. Marthong | 28.06.2018 | completed |
204 | Testing of Concrete Cubes for PGCIL, Shillong. | Power Grid Corporation India Ltd,Shillong | 7,080.00 | Dr. C. Marthong & Dr. M.L.Patton | 28.06.2018 | completed |
205 | Testing of Cement for NIT Meghalaya. | NIT Meghalaya. | 20,060.00 | Dr. C. Marthong | 19-06-2018 | completed |
206 | Testing of Concrete Cubes for PGCIL, Shillong. | Power Grid Corporation India Ltd,Shillong | 36,580.00 | Dr. C Marthong & Dr. ML Patton | 27.08.2018 | completed |
207 | Testing of Coarse agg., Fine agg. & Cement for NERCCDIP, Meghalaya | NERCCDIP, Meghalaya | 20,650.00 | Dr. C Marthong & Dr. ML Patton | 27.08.2018 | completed |
208 | Testing of concrete beams for Airport Authority of India, Shillong | Airport Authority of India, Shillong | 7,080.00 | Dr C Marthong | 27.08.2018 | completed |
209 | Testing of concrete cubes for NERCCDIP, Meghalaya | NERCCDIP, Meghalaya | 3,540.00 | Dr C Marthong | 27.08.2018 | completed |
210 | Testing of cement for CPWD Shillong. | CPWD Shillong | 40,120.00 | Dr. C Marthong & Dr. ML Patton | 27.08.2018 | completed |
211 | Testing of cement and concrete cubes for CPWD Shillong | CPWD Shillong | 27,140.00 | Dr. C. Marthong | 27.08.2018 | completed |
212 | Testing of Concrete Cubes for PGCIL, Shillong. | Power Grid Corporation India Ltd,Shillong | 10,620.00 | Dr. C. Marthong | 27.08.2018 | completed |
213 | Testing of Concrete Cubes for PGCIL, Shillong. | Power Grid Corporation India Ltd,Shillong | 8,850.00 | Dr. C Marthong | 03.10.2018 | completed |
214 | Testing of concrete cubes for St Teresa International School, Shillong | St Teresa International School, Shillong | 2,000.00 | Dr. C Marthong | 03.10.2018 | completed |
215 | Testing of cement for CPWD Shillong. | CPWD Shillong | 10,030.00 | Dr. C Marthong & Dr. ML Patton | 03.10.2018 | completed |
216 | Testing of Concrete Cubes for PGCIL, Shillong. | Power Grid Corporation India Ltd,Shillong | 10,620.00 | Dr. C Marthong & Dr. ML Patton | 03.10.2018 | completed |
217 | Testing of Coarse Agg. Bricks for PGCIL, Shillong | Power Grid Corporation India Ltd,Shillong | 20,650.00 | Dr. C Marthong | 03.10.2018 | completed |
218 | Testing of Cement for PGCIL, Shillong. | Power Grid Corporation India Ltd,Shillong | 10,030.00 | Dr. C Marthong & Dr. ML Patton | 03.10.2018 | completed |
219 | Testing of Fine agg, Coarse agg & Cement for PGCIL, Shillong | Power Grid Corporation India Ltd,Shillong | 64,310.00 | Dr. C Marthong | 05.11.2018 | completed |
220 | Testing of Concrete Core cutting samples for PGCIL, Shillong | Power Grid Corporation India Ltd,Shillong | 37,170.00 | Dr. C Marthong & Dr. ML Patton | 05.11.2018 | completed |
221 | Testing of Vrick, Cement, Concrete cube & water for CPWD, Shillong | CPWD Shillong | 52,805.00 | Dr. C Marthong & Dr. S Sharma | 05.11.2018 | completed |
222 | Testing of Bricks , Cement, concrete cubes for PGCIL, Shillong | Power Grid Corporation India Ltd,Shillong | 40,120.00 | Dr C Marthong | 03.12.2018 | completed |
223 | Vetting of structural design for NEIAH, Shillong | r NEIAH, Shillong | 1,47,500.00 | Dr. C Marthong & Dr. ML Patton | 03.12.2018 | completed |
224 | Vetting of DPR "Greater Sohra water supply" scheme for PHE, Govt. of Meghalaya | PHE, Govt. of Meghalaya | 18,75,000.00 | Dr. C Marthong, Dr. H M Kalita, Dr. D Podder & Dr. D Adak | 05.11.2018 | completed |
225 | Vetting of DPR "Laying of new feeder mains under Tura Phase- I&II water supply scheme, Govt. of Meghalaya | PHE, Govt. of Meghalaya | 26,24,250.00 | Dr. C Marthong, Dr. H M Kalita, Dr. D Podder & Dr. D Adak | 05.11.2018 | completed |
226 | Testing of cement, concrete cubes for PGCIL Shillong | Power Grid Corporation India Ltd,Shillong | 30,680.00 | Dr. C Marthong | 23.01.2019 | completed |
227 | Testing of cement, concrete cubes for PGCIL Shillong | Power Grid Corporation India Ltd,Shillong | 33,630.00 | Dr. C Marthong | 23.01.2019 | completed |
228 | Testing of cement, concrete cubes for PGCIL Shillong | Power Grid Corporation India Ltd,Shillong | 27,140.00 | Dr. C Marthong | 23.01.2019 | completed |
229 | Testing of cement, concrete cubes for PGCIL Shillong | Power Grid Corporation India Ltd,Shillong | 40,170.00 | Dr. C Marthong | 23.01.2019 | completed |
230 | Testing of bricks, concrete cube for PGCIL, Shillong | Power Grid Corporation India Ltd,Shillong | 27,730.00 | Dr. C Marthong | 19.02.2019 | completed |
231 | Testing of concrete cube, fine agg, coarse agg. For NERCCDIP, Shillong | NERCCDIP, Shillong | 31,860.00 | Dr. C Marthong | 19.02.2019 | completed |
232 | Testing of Concrete Cubes for PGCIL, Shillong. | Power Grid Corporation India Ltd,Shillong | 12,390.00 | Dr. C Marthong | 19.02.2019 | completed |
233 | Cantontment Board, Shillong | Cantontment Board, Shillong | 1,00,000.00 | Dr. C Marthong & Dr. ML Patton | 09.10.2019 | Completed |
234 | Testing of cement & concrete cubes for PGCIL, Shillong | Testing of cement & concrete cubes for PGCIL, Shillong | 20,650.00 | Dr. C Marthong | 18.03.2019 | completed |
235 | Testing of Cement for PGCIL, Shillong. | Testing of Cement for PGCIL, Shillong. | 40,120.00 | Dr. C Marthong | 22.03.2019 | completed |
236 | Testing of Concrete Cubes for PGCIL, Shillong. | Power Grid Corporation India Ltd,Shillong | 8,850.00 | Dr. C Marthong | 22.03.2019 | completed |
237 | Testing of cement for construction of NEIAH, Shillong, Phase-II | NEIAH, Shillong, Phase-II | 11,033.00 | Dr. C Marthong | 24.04.2019 | completed |
238 | Cement Testing for Construction of proposed 33/11 kV Mawpat S/s (415 bags) | Power Grid Corporation India Ltd,Shillong | 20,060.00 | Dr. C Marthong | 24.04.2019 | completed |
239 | Testing of boulder, water for CPWD, Shillong IIM Shillong | CPWD Shillong | 3,43,321.00 | Dr. C Marthong & Dr. S. Sharma | 10.06.2019 | completed |
240 | Testing of cement & cubes for Construction of proposed 220/132/33kV New Shillong | Power Grid Corporation India Ltd,Shillong | 42,480.00 | Dr. C Marthong | 24.04.2019 | completed |
241 | Testing of cubes for construction of additional land fill area of 8500 sq.m | MPWD Shillong | 3,540.00 | Dr. C Marthong | 24.04.2019 | completed |
242 | Testing of cement for construction of boundary wall for the additionalmland of NIT, Meghalaya | NIT, Meghalaya | 11,033.00 | Dr. C Marthong | 24.04.2019 | completed |
243 | Material testing for Construction of under ground Reservior, Pump House, internal water supply etc.in the campus of IIM, Shillong | CPWD Shillong | 44,160.00 | Dr. C Marthong | 24.04.2019 | completed |
244 | Testing of cubes for construction of Shillong Government College, Shillong | Government College, Shillong | 7,680.00 | Dr. C Marthong | 24.04.2019 | completed |
245 | Testing of Construction materials for Power Grid under NERPSIP Scheme, Shillong | Power Grid Corporation India Ltd,Shillong | 55,165.00 | Dr. C Marthong | 10.06.2019 | completed |
246 | Testing of Cube sample for Power Grid, New Shillong GIS(Meg- SS-02), NERPSIP | Power Grid Corporation India Ltd,Shillong | 11,682.00 | Dr. C Marthong | 10.06.2019 | completed |
247 | Vetting/ Design of Structures draw bonded warehouse godown Lad Rymbai | Lad Rymbai | 6,000.00 | Dr. C Marthong | 10.06.2019 | completed |
248 | Testing of Boulder for CPWD, Shillong | CPWD Shillong | 5,75,250.00 | Dr. C Marthong & Dr. ML Patton | 17.06.2019 | completed |
249 | Testing of concrete cubes, Power Grid corporation of India | Power Grid Corporation India Ltd,Shillong | 38,940.00 | Dr. C Marthong | 16.08.2019 | completed |
250 | Testing of concrete cubes, Power Grid corporation of India | Power Grid Corporation India Ltd,Shillong | 11,682.00 | Dr. C Marthong | 16.08.2019 | completed |
251 | Testing of construction materials, CPWD, Shillong | Testing of construction materials, CPWD, Shillong | 55,814.00 | Dr. C Marthong | 16.08.2019 | completed |
252 | Testing of construction materials, Meghalaya Information technology Society, Shillong | Meghalaya Information technology Society, Shillong | 67,500.00 | Dr. C Marthong | 16.08.2019 | completed |
253 | Concrete mix design, IRCON Infrastructure & Service Ltd. at Dawki, Meghalaya | IRCON Infrastructure & Service Ltd. at Dawki, Meghalaya | 44,781.00 | Dr. C Marthong | 16.08.2019 | completed |
254 | Testing of construction materials, Power Grid corporation of India | Power Grid Corporation India Ltd,Shillong | 37,347.00 | Dr. C Marthong | 16.08.2019 | completed |
255 | Tesing of construction materials, PGCIL Shillong | Power Grid Corporation India Ltd,Shillong | 38,291.00 | Dr. C Marthong & Dr. ML Patton | 16.08.2019 | completed |
256 | Testing of construction materials, Power Grid corporation of India | Power Grid Corporation India Ltd,Shillong | 22,066.00 | Dr. C Marthong & Dr. ML Patton | 01.10.2019 | completed |
257 | Structural Assessment of M/s Marrinette Challam building, Garikhana, lamavilla, Shillong | M/s Marrinette Challam building, Garikhana, lamavilla, Shillong | 6,000.00 | Dr. C Marthong | 01.10.2019 | completed |
258 | Structural Design, MES Shillong | MES Shillong | 6,85,224.00 | Dr. C Marthong & Dr. ML Patton | 01.10.2019 | completed |
259 | Testing of construction materials, Power Grid Corporation of India | Power Grid Corporation India Ltd,Shillong | 11,682.00 | Dr. C Marthong & Dr. ML Patton | 06.11.2019 | completed |
260 | Testing of construction materials, CPWD Shillong | CPWD Shillong | 82,836.00 | Dr. C Marthong | 06.11.2019 | completed |
261 | Testing of construction materials, CPWD Shillong | CPWD Shillong | 44,132.00 | Dr. C Marthong | 06.11.2019 | completed |
262 | Testing of construction materials, CPWD Shillong | CPWD Shillong | 33,099.00 | Dr. C Marthong | 06.11.2019 | completed |
263 | Testing of water, CPWD Shillong | CPWD Shillong | 6,490.00 | Dr. C Marthong & Dr. ML Patton | 06.11.2019 | completed |
264 | Testing of construction materials, CPWD Shillong | CPWD Shillong | 8,850.00 | Dr. C Marthong & Dr. ML Patton | 06.11.2019 | completed |
265 | Concrete mix design, CPWD Shillong | CPWD Shillong | 44,160.00 | Dr. C Marthong & Dr. ML Patton | 06.11.2019 | completed |
266 | Testing of construction materials, Power Grid Corporation of India | Power Grid Corporation India Ltd,Shillong | 14,160.00 | Dr. C Marthong & Dr. ML Patton | 20.12.2019 | completed |
267 | Testing of construction materials, Power Grid Corporation of India | Power Grid Corporation India Ltd,Shillong | 99,946.00 | Dr. C Marthong | 20.12.2019 | completed |
268 | Testing of construction materials, Power Grid Corporation of India | Power Grid Corporation India Ltd,Shillong | 7,788.00 | Dr. C Marthong | 20.12.2019 | completed |
269 | Testing of construction materials, Power Grid Corporation of India | Power Grid Corporation India Ltd,Shillong | 19,470.00 | Dr. C Marthong | 17.01.2020 | completed |
270 | Concrete mix design, MPWD Shillong | MPWD Shillong | 44,781.00 | Dr. C Marthong | 29.01.2020 | completed |
271 | Testing of construction materials, MPWD Shillong | MPWD Shillong | 34,397.00 | Dr. C Marthong | 29.01.2020 | completed |
272 | NDT Tesing, NERPSIP Meghalaya | Power Grid Corporation India Ltd,Shillong | 44,781.00 | Dr. C Marthong & Dr. ML Patton | 29.01.2020 | completed |
273 | Concrete mix design, MPWD Shillong | MPWD Shillong | 44,160.00 | Dr. C Marthong | 29.01.2020 | completed |
274 | Concrete mix design, MPWD Shillong | Concrete mix design, MPWD Shillong | 44,781.00 | Dr. C Marthong | 29.01.2020 | completed |
275 | Vetting of Estimate and structural design, construction of traditional indistry with furnitures cum skill development center, Mawkyllei, West Khasi Hills. | MPWD Shillong | 82,600.00 | Dr. C Marthong | 29.01.2020 | completed |
276 | Testing of construction materials, Atomic Minerals Directorate for Exploration & research (NER), Shillong | Atomic Minerals Directorate for Exploration & research (NER), Shillong | 5,310.00 | Dr. C Marthong | 06.03.2020 | completed |
277 | Testing of construction materials, CPWD Shillong | CPWD Shillong | 1,19,416.00 | Dr. C Marthong | 06.03.2020 | completed |
278 | Testing of construction materials, CPWD Shillong | CPWD Shillong | 6,490.00 | Dr. C Marthong | 06.03.2020 | completed |
279 | Testing of construction materials, NERIE, Umiam, Shillong | NERIE, Umiam, Shillong | 25,665.00 | Dr. C Marthong | 06.03.2020 | completed |
280 | Structural design of extension of Chriastian Youth Center Annex Building, Laitumkhrah Presbyterian Church, Shillong | Laitumkhrah Presbyterian Church, Shillong | 45,000.00 | Dr. C Marthong | 06.03.2020 | completed |
281 | Construction of Additional landfill Area of 8500 sqm and Ancillary works (Phase 2) at Marten, Shillong, package no. NERCCDIP/TR-02/SHG/SWM/04 (Testing of Steel) | SIPMIU, Shillong | 47,790.00 | Dr. Deba Kumar Sarma | 13.02.2019 | Completed |
282 | Conducting test for the works "Construction of Garage cum Workshop shed and Staff Rest Room (Balance works) under Tranche- II at old Landfill site at Marten Shillong" | SIPMIU, Shillong | 24,980.00 | Dr. Deba Kumar Sarma | 19.01.2017 | Completed |
283 | Conducting test for the works "Construction of Garage cum Workshop shed and Staff Rest Room (Balance works) under Tranche- II at old Landfill site at Marten Shillong" | SIPMIU, Shillong | 15,870.00 | Dr. Deba Kumar Sarma | 21.02.2017 | Completed |
284 | Construction of Academic Block, Hostel Buliding cum Dining Hall and 63 Residential Quarters (18 Type I, 18 Type II, 18 Type III, 8 Type V and Director's Bungalow) including internal water supply, sanitary installation and internal electrical installation for RGIIM at Shillong (Phase I) Testing & Alluminism Section | CPWD, Shillong , Meghalaya | 11,800.00 | Dr. Deba Kumar Sarma | 12.09.2017 | Completed |
285 | Construction of RCC & RR Masonsy Retaining walls, gates, parking, under ground tank, covered corridor, external water supply, external fire fighting, Sewerage, Draining systems, Intake pumps, Field Area, Site Grading, Signages and other ancillary works for NIT Meghalaya | RITES Limited | 26,550.00 | Dr. Deba Kumar Sarma | 30.10.2017 | Completed |
286 | Testing of the H.S.D. TMT Bars sizes (8 mm, 10 mm, 12 mm, 16 mm, 28 mm & 25 mm) | P.W.D. (B), Meghalaya, Shillong | 56,640.00 | Dr. Deba Kumar Sarma | 31.10.2017 | Completed |
287 | Rod Testing for "St. Teresa International School" | Donvsh Siangshai Educational Trust | 37,800.00 | Dr. Deba Kumar Sarma | 24.10.2017 | Completed |
288 | Testing of steel for the work development of Rajiv Gandhi Indian Institute of Management at Umsawali, Shillong (SH: Construction of RCC overload Water Tank and Water Body) | CPWD, Dhankheti, Shillong -793003 | 1,13,280.00 | Dr. Deba Kumar Sarma | 26.12.2017 | Completed |
289 | Testing of Aluminium (Sections) for Construction of Auditorium, Boys Hostel and Girls Hostel (Single Seater), Boys hostel (three seater, Director's Bungalow, Guest House, Residential type D & E etc of NIT Meghalaya at Sohra (Cherrapunjee) | RITES Limited | 23,600.00 | Dr. Deba Kumar Sarma | 25.01.2018 | Completed |
290 | Testing of Structural Steel "for the work" Development of RGSSM Campus at Shillong. SH: Construction of RCC overload Water Tank and Water Bodies." | CPWD, Shillong , Meghalaya | 35,400.00 | Dr. Deba Kumar Sarma | 23.03.2018 | Completed |
291 | Construction of RCC & RR Masonsy Retaining walls, gates, parking, under ground tank, covered corridor, external water supply, external fire fighting, Sewerage, Draining systems, Intake pumps, Field Area, Site Grading, Signages and other ancillary works for NIT Meghalaya | RITES Limited | 55,460.00 | Dr. Deba Kumar Sarma | 26.04.2018 | Completed |
292 | Conducting test for the works "Procurement of Equipment for Landfill Site and Compost Plant, Shillong- Inspection of Skid Steer loader SSL 155 with solid tyre" | State Investment Project Management and Implementation Unit (SPIMIU), Shillong | 82,600.00 | Dr. Deba Kumar Sarma | 28.08.2018 | Completed |
293 | Conducting test for the works "Construction of Additional Landfill Area of 8500 Sqm and Ancillary Works (Phase 2) | State Investment Project Management and Implementation Unit (SPIMIU), Shillong | 47,790.00 | Dr. Deba Kumar Sarma | 27.07.2017 | Completed |
294 | Testing of TMT for the Work: "C/o Building for JNV (ph-B) at Nongstoin, Distt: West Khasi Hills Meghalaya (SH: C/o 1nos Girls Dormitory 0.25 with Warden qtrs i/c, W/S & S/S and internal E/I | CPWD, Shillong , Meghalaya | 37,760.00 | Dr. Deba Kumar Sarma | 10.09.2018 | Completed |
295 | Construction of Shillong Government College of Engineering at Shillong, East Khasi Hills Meghalaya | PWD (B) Government of Meghalaya | 56,640.00 | Dr. Deba Kumar Sarma | 22.01.2019 | Completed |
296 | Testing of Steel materials used for construction of bridges on Nongiri to Misei road under PMGSY Package no. : MG/07/03/01 | Executive Engineer (T/C) PWD (Roads) Western Circle cum DPIU, PMGSY, West Khasi Hills | 51,920.00 | Dr. Deba Kumar Sarma | 18.03.2019 | Completed |
297 | Testing of Steel Rod used for construction of Bridges on a road from Umdong to Jaiaw under PMGSY Package No. MG/07/03/44 | Executive Engineer (T/C) PWD (Roads) Western Circle cum DPIU, PMGSY, West Khasi Hills | 63,720.00 | Dr. Deba Kumar Sarma | 20.03.2019 | Completed |
298 | Testing of Steel for "Construction of Boundary wall for the additional land of NIT Meghalaya at Sohra ( Cherrapunjee) - Plot No. 258 Group No. 11" reg | M/s Victor Suja for the work of NIT Meghalaya | 47,200.00 | Dr. Deba Kumar Sarma | 09.04.2019 | Completed |
299 | Construction of Additional landfill Area of 8500 sqm and Ancillary works (Phase 2) at Marten, Shillong, package no. NERCCDIP/TR-02/SHG/PH 2/SWM/04 (Testing of Steel) | M/S B.D. Marbaniang | 8,850.00 | Dr. Deba Kumar Sarma | 05.04.2019 | Completed |
300 | Construction of under Ground Reservior, Pump House, Internal Water supply, approach Road, Developement of right side LCS-1 and retaining wall near water treatment plant in the Campus of IIM Shillong at Umsawli, New Shillong Township, Shillong, Meghalaya | CPWD, Shillong , Meghalaya | 89,680.00 | Dr. Deba Kumar Sarma | 29.07.2019 | Completed |
301 | Balanced development work surrounding the Academic Block 63 Nos. Residential Quaters, Dinning Block and Water Bodies in the Campus of IIM Shillong at Umsawli, New Shillong Township, Shillong | CPWD, Shillong , Meghalaya | 49,560.00 | Dr. Deba Kumar Sarma | 15.10.2019 | Completed |
302 | Construction of Regional Labour Institute of Shillong, Meghalaya (SH: C/o Office Building (G+3), hosted Building (G+3), i/c internal water supply, sanitary installation, rataining wall, underground sump, tablewell, allied civil development work internal electrical installation and fans, first aid hose red, life DG sel, streat, lighting and electrical service connection | CPWD, Shillong , Meghalaya | 77,880.00 | Dr. Deba Kumar Sarma | 15.10.2019 | Completed |
303 | Construction of Regional Labour Institute of Shillong, Meghalaya (SH: C/o Office Building (G+3), hosted Building (G+3), i/c internal water supply, sanitary installation, rataining wall, underground sump, tablewell, allied civil development work internal electrical installation and fans, first aid hose red, life DG sel, streat, lighting and electrical service connection | CPWD, Shillong , Meghalaya | 54,280.00 | Dr. Deba Kumar Sarma | 15.10.2019 | Completed |
304 | Construction of Regional Labour Institute of Shillong, Meghalaya (SH: C/o Office Building (G+3), hosted Building (G+3), i/c internal water supply, sanitary installation, rataining wall, underground sump, tablewell, allied civil development work internal electrical installation and fans, first aid hose red, life DG sel, streat, lighting and electrical service connection | CPWD, Shillong , Meghalaya | 28,320.00 | Dr. Deba Kumar Sarma | 15.10.2019 | Completed |
305 | Construction of Regional Labour Institute of Shillong, Meghalaya (SH: C/o Office Building (G+3), hosted Building (G+3), i/c internal water supply, sanitary installation, rataining wall, underground sump, tablewell, allied civil development work internal electrical installation and fans, first aid hose red, life DG sel, streat, lighting and electrical service connection | CPWD, Shillong , Meghalaya | 49,560.00 | Dr. Deba Kumar Sarma | 15.10.2019 | Completed |
306 | Testing of Steel for the work: "Construction of Commerical complex of Shri Mohendra Rapang at M.G. Road Shillong | M/s Rishen Rapsang | 77,880.00 | Dr. Deba Kumar Sarma | 14.10.2019 | Completed |
307 | Construction of under Ground Reservior, Pump House, Internal Water supply, approach Road, Developement of right side LCS-1 and retaining wall near water treatment plant in the Campus of IIM Shillong at Umsawli, New Shillong Township, Shillong, Meghalaya | CPWD, Shillong , Meghalaya | 14,160.00 | Dr. Deba Kumar Sarma | 14.10.2019 | Completed |
308 | Testing of steel for the work development of Rajiv Gandhi Indian Institute of Management at Umsawali, Shillong (SH: Construction Design and SITE of sewerage treatment plant including Civil and Electro Mechanical works based on MBBR Technology | CPWD, Shillong , Meghalaya | 23,600.00 | Dr. Deba Kumar Sarma | 14.10.2019 | Completed |
309 | Quality check of the ongoing construction of the residential building of PH-II-NEIAH, Shillong | National Projects Construction Corporation Ltd. NPCC), Shillong | 8,99,271.00 | Dr. C Marthong & Dr. ML Patton | 30-06-2020 | Ongoing |
310 | Technical and economic appraisal of DPR for project recommended by DONER under NESIDS (Laying of feeder mains under TURA Phase I & II water supply scheme) | PHED, Govt. of Meghalaya | 55,24,621.00 | Dr. C Marthong, Dr. ML Patton & Dr. H.M.Kalita | 27-08-2020 | completed |
311 | Vetting of TRI, Tura, PWD(B), Govt. of Meghalaya | Art and Culture, Govt. of Meghalaya | 31,46,000.00 | Dr. C.Marthong, Dr. M.L.Patton, Dr. H.M.Kalita, Dr. D.K.Sarma, Dr. R.S.Das, Dr. P.K.Rathore, Dr. S. Debbarma | 09-10-2020 | Ongoing |
312 | Testing of materials for construction of open store yard with PCC PAD near switch yard area, 132 KV, Khliehriat, Sub-station | Power Grid Coorporation India Ltd. | 67,319.00 | Dr. C Marthong | 20-10-2020 | completed |
313 | Construction of Regional Labour Institute at Shillong, Meghalaya (SH: C/o Office Building (G+3), hostel Building (G+3), i/c internal water supply, sanitary installation, rataining wall, underground sump, tubewell, allied civil development work, internal electrical installation and fans, first aid hose reel, lift, DG set, street lighting and electrical service connection) | CPWD, Shillong, Meghalaya | 2,73,760.00 | Dr. Deba Kumar Sarma | 19-11-2020 | |
314 | Testing of materilas for const. of 220/132 KV, Mawngap GIS Sub-Station | Power Grid Coorporation India Ltd. | 9,735.00 | Dr. C Marthong | 24-11-2020 | completed |
315 | Mix design for M/s Singla Associate (AGE) | MES (AGE), Shillong | 89,557.00 | Dr. C Marthong & Dr. ML Patton | 24-11-2020 | completed |
316 | Testing of concrete cubes for construction of 220/132 KV Mawngap Sub-station | Power Grid Coorporation India Ltd. | 19,470.00 | Dr. C Marthong | 24-11-2020 | completed |
317 | Conducting Mix design for const. of Commercial Complex, Polo Bazar, Shillong | M/s Badri Rai & Co. | 44,781.00 | Dr. C Marthong | 24-11-2020 | completed |
318 | Testing of concrete cubes for const. of Add. Landfill and Ancillary works at Marten, Shillong | Sri. B.D.Marbaninag, Contractor | 1,947.00 | Dr. C Marthong | 24-11-2020 | completed |
319 | Testing of materials for const. of Regional labour Institute at Shillong | CPWD, Shillong | 1,52,515.00 | Dr. C Marthong & Dr. ML Patton | 24-11-2020 | completed |
320 | Conducting Mix design (M25 & M30) for IIM Shillong Project | SOM Project and RITES Ltd. | 83,870.00 | Dr. C Marthong | 24-11-2020 | completed |
321 | Expert techno- commerical opinion on O&M of Electric Sub-stations | NEIGRIHMS, Mawdiangdiang, Shillong | 67,500.00 | Dr. Sanjoy Debbarma, Dr. Shaik Affijulla, Dr. Atanu Banerjee | 17-12-2020 | completed |
322 | Concrete Mix design and testing (M35 grade normal concrete and M30 grade of self-compacting concrete) | MSL Jamgid JV, Sector -45, Noida-201301 | 1,16,820.00 | Dr. Dibyendu Adak | 18-12-2020 | completed |
323 | Proposal to undertake Comprehensive power harmonic study of HT/LT power system of IFCAL plant | IFCAL, A Govt of Odisha Undertaking | 35,000.00 | Prof. G. Panda | 12-02-2021 | completed |
324 | Conducting Mix design (M25 & M30) for IIM Shillong Project | SOM Project and RITES Ltd. | 83,869.00 | Dr. C Marthong & Dr. ML Patton | 23-02-2021 | completed |
325 | Testing of Concrete cubes for const. of Security Barrack at RHQ, Shillong | Power Grid Coorporation India Ltd. | 5,841.00 | Dr. C Marthong | 23-02-2021 | completed |
326 | Testing of concrete cubes for const. of 132/33 KV Ampati (Ext), under NERPSIP, Phulbari | Power Grid Coorporation India Ltd. | 36,993.00 | Dr. C Marthong & Dr. ML Patton | 23-02-2021 | completed |
327 | Testing of materials for const. of IIM Shillong projects | CPWD, Shillong | 36,993.00 | Dr. C Marthong | 23-02-2021 | completed |
328 | Safety audit of Maraikaphon Dorbar halls, Sohra | Maraikhappon Dorbar, Sohra | 8,850.00 | Dr. C Marthong | 23-02-2021 | completed |
329 | Material Tesing of HYSD TMT Bars | SRMB Srijan Pvt | 92,040.00 | Dr. Deba Kumar Sarma | 20-03-2021 | |
330 | Testing of materials for const. of boundary wall of 220/132 KV Mawngap sub-station, NERPSIP Meghalaya | Power Grid Coorporation India Ltd. | 11,033.00 | Dr. C Marthong | 25-03-2021 | completed |
331 | Testing of concrete cubes and bricks const. of 220/132/33 KV,New Shillong GIS Sub-station for mES SS 02 package | Power Grid Coorporation India Ltd. | 8,437.00 | Dr. C Marthong | 25-03-2021 | completed |
332 | Vetting of estimates for const. of Science Technology and Innovation Hub and Micro processing Unit Implemented by Martin Luther Christian University, Shillong | Martin Luther Christian University, Shillong | 28,000.00 | Dr. C Marthong & Dr. ML Patton | 25-03-2021 | completed |
333 | Testing of soil brick | Soil and Water Conservation Dept, Govt of Meghalaya | 5,900.00 | Dr. C Marthong | 25-03-2021 | completed |
334 | Testing of Materials | RITES Ltd.., MPWD, CPWD, SIPMIU | 33,00,000.00 | Dr. Deba Kumar Sarma | 01-07-2021 | Ongoing |
335 | Reinforcement Test required to done for Laitumkhrah Prebyterian Church Shillong | Ibanlang Wallang - Shilllong - 1 | 28,320.00 | Dr. Deba Kumar Sarma | 31-08-2021 | |
336 | Structural assessment of Horse Shoe Building, Govt. of meghalaya | PWD(B), Govt. of Meghalaya | 3,50,000.00 | Dr. C.Marthong & Dr. M.L.Patton | 15-11-2021 | completed |
337 | Testing of Materials | Power Grid Corporation Ltd. | 5,841.00 | Dr. C.Marthong | 15-11-2021 | completed |
338 | Testing of Materials | Power Grid Corporation Ltd. | 13,200.00 | Dr. C.Marthong | 15-11-2021 | completed |
339 | Testing of Materials | Power Grid Corporation Ltd. | 12,036.00 | Dr. C.Marthong | 15-11-2021 | completed |
340 | Testing of Materials | Power Grid Corporation Ltd. | 58,870.00 | Dr. C.Marthong | 15-11-2021 | completed |
341 | Testing of Soil | Mr. Thomas Hashah, Govt. first class contractor, Sadew, Upper Shillong, Meghalaya | 25,000.00 | Dr. Smrutirekha Sahoo | 16-11-2021 | completed |
342 | Preparation of Structural Design of proposed Woodland Hospital, Shillong - Annex | Woodland Hospital Shillong | 3,50,000.00 | Dr. C.Marthong | 02-12-2021 | completed |
343 | Vetting of DPR | Directorate of Tourism, Govt. of meghalaya | 31,31,841.00 | Dr. C.Marthong, Dr.M.L.Patton, Dr.H.M.Kalita, Dr.D.K.Sarma,Dr. A.Banerjee, Dr. S. Debbarma | 16-12-2021 | completed |
344 | Testing of Reinforcement for Construction of Hostel at IIM Shillong |
Immanuel L. Hmar Manager(Civil)/RITES Ltd. Ph: +919957518029 Email: immahmar125@gmail.com RITES Site Office, IIM Shillong Umsawli, Shillong-793018, Meghalaya |
81,420.00 | Dr. Deba Kumar Sarma | 22-12-2021 | |
345 | Testing of Concrete Cubes | Shillong,Lawmali | 31,152.00 | Dr C.Marthong | 23-12-2021 | completed |
346 | Testing of Reinforcement for construction, renovation & extension of work of Health Facilities under Directorate of Health Services, Government of Meghalaya |
Shri B.D. Marbaniang Registered Govt. Contractor & Supplier |
57,820.00 | Dr. Deba Kumar Sarma | 29-12-2021 | |
347 | Vetting/Third party inspection of completed works under the scheme "Augmentation of the 132 KV Mawlai grid Sub-Station from 3x20 MVA to 3x50 MVA | Meghalaya Power Transmission Corporation Ltd. Shillong | 2,19,930.00 | Dr. Sanjoy Debbarma and Dr. C. Marthong | 04-01-2023 | completed |
348 | Vetting of the Structural drawing of Smti Milda Rynjah Plot no 3 behind St. Mary at Laitumkhrah Shillong | Fawsdesign Architects, Shillong | 10,000.00 | Dr. C. Myrthong | 17-01-2022 | completed |
349 | Testing of Cement Concrete Cubes for Directorate of Health Services, Govt. of Meghalaya | Sri. B D Marbaniang, Shillong | 9,735.00 | Dr. C Marthong | 14-02-2022 | completed |
350 | Material Testing of Reinforcement for construction related work at IHM, Shillong Campus. | Shri B D Marbaniang, Contractor | 27,140.00 | Dr. Deba Kumar Sarma, Dr. M. Rahang | 07-03-2022 | |
351 | Third party quality assurance (TPQA) to strengthen further construction quality of EMRSs - Finalization of TPQA Agency | Manipur Industrial Development Corporation Limited, A Govt. of Manipur Undertaking | 2,59,60,000.00 | Dr. C.Marthong and Dr. M.L.Patton | 09-03-2022 | Not yet started |
352 | Material Testing of Reinforcement for construction related work at IHM, Shillong Campus. |
Shri B D Marbaniang, Registered Govt. Contractor & Supplier Office Address: 'ADELINA' Lawmali, Shillong-793001 |
36,580.00 | Dr. Deba Kumar Sarma, Dr. M. Rahang | 09-03-2022 | |
353 | Material Testing of Reinforcement for construction related work at IHM, Shillong Campus. |
Shri B D Marbaniang, Registered Govt. Contractor & Supplier Office Address: 'ADELINA' Lawmali, Shillong-793001 |
17,700.00 | Dr. Deba Kumar Sarma, Dr. M. Rahang | 14-03-2022 | |
354 | Vetting of the RCC structural drawings and structural roof trusses of the project for construction of indoor sports hall including RCC sitting gallery at Umlyngka, East Khasi Hills District, Meghalaya | State Sports Council, Meghalaya Shillong | 1,53,400.00 | Dr. C.Marthong and Dr. M.L.Patton | 25-03-2022 | completed |
355 | Material Testing of Reinforcement for construction related work at IHM, Shillong Campus. |
Shri B D Marbaniang, Registered Govt. Contractor & Supplier Office Address: 'ADELINA' Lawmali, Shillong-793001 |
17,700.00 | Dr. Deba Kumar Sarma, Dr. M. Rahang | 28-03-2022 | |
356 | Vetting of DPR for Directorate of Tourism for Water Centre at Sohra, Meghalaya, Govt. of Meghalaya | Directorate of Tourism, Government of Meghalaya | 19,06,578.52 | Dr. C.Marthong, Dr. M.L.Patton, Dr. H.M. Kalita, Dr. D.K.Sarma | 12-04-2022 | completed |
357 | Vetting of DPR for Directorate of Tourism for Nongkhnum Island, West Khasi Hills, Meghalaya | Directorate of Tourism, Government of Meghalaya | 8,43,881.24 | Dr. C.Marthong, Dr. M.L.Patton, Dr. H.M. Kalita, Dr. D.K.Sarma | 12-04-2022 | completed |
358 | Vetting of DPR for Directorate of Tourism for Development of Nongmahir Reserviour, Ri Bhoi District, Meghalaya | Directorate of Tourism, Government of Meghalaya | 14,39,547.27 | Dr. C.Marthong, Dr. M.L.Patton, Dr. H.M. Kalita, Dr. D.K.Sarma | 12-04-2022 | completed |
359 | Testing of concrete cubes for IHM Shillong Campus | Shri. B D Marbainiang, Mawlai Shillong | 17,523.00 | Dr. C Marthong | 12-04-2022 | completed |
360 | testing of cement | N.P.C.C Ltd | 11,033.00 | Dr C.Marthong | 06-05-2022 | completed |
361 | Vetting of DPR Tura Beautification (Dakopre)- West Garo Hills, Meghalaya and Street lighting works from Chandmari Junction to BSF Junction after Dakopgre on the way to Pelga falls, Tura Meghalaya | Directorate of Tourism, Government of Meghalaya | 12,37,972.15 | Dr. C.Marthong, Dr. M.L.Patton, Dr. H.M. Kalita, Dr. D.K.Sarma | 10-05-2022 | completed |
362 | Material Testing of Reinforcement for construction of RCC Wall And Multi Storeys Building at IIM Shillong |
IIM Shillong Umsawli, Shillong-793018 Meghalaya |
17,700.00 | Dr. D. K. Sarma, Dr. M. Rahang | 19-05-2022 | |
363 | Testing of concrete cube for Power Grid Corporation of India Ltd. Shillong | Power Grid Corporation of India Ltd. Shillong | 25,311.00 | Dr. C Marthong | 21-05-2022 | completed |
364 | Structural design for St. Xavier's College at Umoid in the South West Khasi Hills Dt., Meghalaya | St. Xavier's College Umnoid, S.W.Khasi Hills, Meghalaya | 1,77,000.00 | Dr. C.Marthong | 26-05-2022 | completed |
365 | Structural assessment of inhabitability of CGWB Building, Keating Road, Shillong | Central Ground Water Board, Shillong | 5,90,000.00 | Dr. C.Marthong, Dr. M.L.Patton, Dr. H.M. Kalita | 27-05-2022 | project cancelled by the client |
366 | Vetting of the structural drawing & structural roof trusses of the project for the construction of Indoor sports hall at Mawpat, East Khasi Hills District, Meghalaya | State Sports Council Meghalaya, Shillong | 6,00,000.00 | Dr. C.Marthong and Dr. M.L.Patton | 27-05-2022 | project cancelled by the client |
367 | Testing of Bricks |
HSCC (INDIA) LTD NEIGRIHMS MAWDIANGDIANG |
7,080.00 | Dr C.Marthong | 12-06-2022 | completed |
368 | Vetting of the structural drawings and structural roof trusses of the project for construction of Multipurpose Indoor sport hall at: (a) Umkhoi, East Khasi Hills, Meghalaya (b) Lawsohtun, East Khasi Hills Meghalaya (d) Jengal, West Garo Hills Meghalaya and (d)William Nagar East Garo Hills, Meghalaya | State Sports Council Meghalaya, Shillong, Govt. of Meghalaya | 31,83,561.83 | Dr. C.Marthong and Dr. M.L.Patton | 13-06-2022 | |
369 | Design mix of concrete - M25 and compression test of concrete cubes | NICE Infotech, Shillong | 52,569.00 | Dr D Adak | 13-06-2022 | completed |
370 | cement testing | Goldstone Cements Ltd | 22,066.00 | Dr C . Marthong | 14-06-2022 | completed |
371 | Testing of Building Construction Material | C.P.W.D Shillong | 1,65,200.00 | Dr C.Marthong | 14-07-2023 | completed |
372 | Material Testing of Reinforcements for construction related work at IIM, Shillong |
Shree Gautam Construction Co. Ltd. 4th Floor, Amaze, Shopping Mall A.T. Road, Guwahati-781001 |
1,03,840.00 | Dr. D. K. Sarma, Dr. M. Rahang | 15-07-2022 | |
373 | Vetting of DPR for construction of Thadlaskein Hospitality Complex, West Jaintia Hills Meghalaya | Directorate of Tourism, Government of Meghalaya | 25,01,948.30 | Dr. C.Marthong, Dr. M.L.Patton, Dr. H.M. Kalita, Dr. D.K.Sarma | 28-07-2022 | completed |
374 | Concrete mix design of M25 and M30 for construction of business Park cum Tourism Cultural Centre, Police Bazar Shillong | M/s Badri Rai & Co. Pvt. Ltd. Sun Cottage, Arbutnut Road, Laitumkhrah, Shillong-793003 | 1,28,562.00 | Dr. C.Marthong | 06-08-2022 | completed |
375 | Testing of concrete cubes and water | NICE Infotech, Shillong | 21,948.00 | Dr D Adak | 06-08-2022 | completed |
376 | Testing of Reinforcement materials for construction of Hospital Block and Academic Campus fro AIIMS at Guwahati (Assam) PMSSY-III |
B. Goswami Sr. DGM/RITES Ltd. Dukan Road (Near Sohra Police Station) Sohra, East Khasi Hills Meghalaya, Pin-793108 |
44,840.00 | Dr. D. K. Sarma | 23-08-2022 | |
377 | Mix Design for Bitumen Macadam (PMGSY-II, 2019-2020) - PWD Roads, Meghalaya | Moses Lyngdoh, Laitumukhrah, Shillong 793003, Meghalaya | 42,421.00 | Dr. P K Gautam &; Shri. S Kaushik | 26-08-2022 | |
378 | NDT, Core sample collection and testing, testing of reinforcement (12mm and 10 mm steel bars) | Meghalaya Zoo Project Implementation Society (MZIP), Shillong | 4,72,000.00 | Dr. C.Marthong and Dr. M.L.Patton | 30-08-2022 | completed |
379 | Vetting of DPR- Developement of Mawlyndep Hospitality Complex in Meghalaya under Directorate of Tourism, Govt. of Meghalaya | Directorate of Tourism, Government of Meghalaya | 21,24,000.00 | Dr. C.Marthong, Dr. M.L.Patton, Dr. H.M. Kalita, Dr. D.K.Sarma | 30-09-2022 | completed |
380 | Vetting of DPR- Developement of Bansamgre Village, East Garo Hills, Meghalaya | Directorate of Tourism, Govt. of Meghalaya | 5,50,372.10 | Dr. C.Marthong, Dr. M.L.Patton, Dr. H.M. Kalita, Dr. D.K.Sarma | 07-10-2022 | completed |
381 | Vetting of DPR- Development of Kemragre village, West Garo Hills, Meghalaya | Directorate of Tourism, Government of Meghalaya | 4,36,408.35 | Dr. C.Marthong, Dr. M.L.Patton, Dr. H.M. Kalita, Dr. D.K.Sarma | 07-10-2022 | completed |
382 | Vetting of DPR-Development works at Mawlam village, Pynursla meghalaya | Directorate of Tourism, Government of Meghalaya | 4,87,889.60 | Dr. C.Marthong, Dr. D.K.Sarma | 21-10-2022 | completed |
383 | Vetting of DPR for Tourism Accommodation facility at Nongjrong Village, Meghalaya | Directorate of Tourism, Government of Meghalaya | 3,46,534.00 | Dr. C.Marthong, Dr. D.K.Sarma | 08-11-2022 | completed |
384 | Testing of reinforcement materials |
M/s Meghalaya Steels Limited, EPIP, Umtru Road, Norbung Byrnihat, Distt- Ri-bhoi Pin-793101, Meghalaya |
99,120.00 | Dr. D. K. Sarma | 09-11-2022 | |
385 | Vetting of DPR for Development of Umkrem, Meghalaya | Directorate of Tourism, Government of Meghalaya | 7,08,000.00 | Dr. C.Marthong, Dr. D.K.Sarma | 09-11-2022 | completed |
386 | Vetting of DPR for Redevelopment of Orchid lake Hospitality Complex, Ri Bhoi, Meghalaya amounting to Rs. 18,27,06,417.00 | Directorate of Tourism, Govt. of Meghalaya | 12,93,561.43 | Dr. C.Marthong, Dr. D.K.Sarma | 28-11-2022 | completed |
387 | Vetting of DPR for Development of Chibragre - Venue for Wangala Festival in Meghalaya amounting to Rs. 20,58,79,294.00 | Directorate of Tourism, Govt. of Meghalaya | 14,57,625.40 | Dr. C.Marthong, Dr. D.K.Sarma | 28-11-2022 | completed |
388 | Technical and economic appraisal of DPR for project recommended by DoNER for funding under NESIDS- Bulk water supply to adjoining villages of Tura town, PHED, Meghalaya@ Rs. 97,76,67,809.00 | PHED, Govt. of Meghalaya | 74,98,712.10 | Dr. C.Marthong, Dr. H.M. Kalita, Dr. D.K.Sarma | 02-12-2022 | ongoing |
389 | Testing of Reinforcement required for Construction at IIM Shillong |
Som Projects Pvt. Ltd. 403, Suneja Tower-I, District Centre, Janakpuri, New Delhi-110058 |
1,22,720.00 | Dr. Deba Kumar Sarma | 24-12-2022 | |
390 | Testing of Construction materials for SOM Projects Pvt. Ltd. | SOM Projects Pvt. Ltd. Haryana | 85,727.00 | Dr. C. Marthong | 24-12-2022 | completed |
391 | Vetting of Hotel Project at Mawbah, Golf Link, Shillong for Mr. Rocky Dhar | Shri. Rocky Dhar, proprietor Hotel Vista, Mawbah Golf Link | 59,000.00 | Dr. C. Marthong | 01-06-2023 | completed |
392 | Testing of Reinforcement required for Construction RELATED PURPOSE at 1st AR BV |
Shree Meghalaya Construction & Supply Co. Assam Rifles Bazar, Happy Valley Shillong-793007(Meghalaya) |
46,020.00 | Dr. Deba Kumar Sarma | 11-01-2023 | |
393 | Structural design of Shillong College Higher Secondary Education Building, Shillong | Shillong College Higher Secondary Education Shillong | 3,54,000.00 | Dr. C.Marthong | 24-01-2023 | completed |
394 |
Testing of Reinforcement required for construction purpose by BRO |
"15 BRO PIN 930015 c/o 99 APO" |
35,400.00 | Dr. Deba Kumar Sarma Dr. Kishore Debnath | 07-03-2023 | |
395 | Testing of Flexural strength of Concrete beam samples for Airport Authority of India Shillong |
"M/S Surface Tech India Pvt Ltd, Guwahati 781001, Assam GSTIN: 17AAHCS4907J1Z3 Client: Airport Authority of India Shillong" |
7,080.00 | Dr. Praddep Kumar Gautam | 03-31-2023 | Completed |
396 | Material Reinforcement Testing of TMT Bar for Product Approval |
"Shakambhari Ispat & Power Ltd. Kolkata-700017, West Bengal, India" |
1,16,820.00 | Dr. Deba Kumar Sarma | 06-05-2023 | |
397 | Testing of Flexural strength of Concrete beam samples for Airport Authority of India Shillong |
"M/S Surface Tech India Pvt Ltd, Guwahati 781001, Assam GSTIN: 17AAHCS4907J1Z3 Client: Airport Authority of India Shillong" |
4,000.00 | Dr. Pradeep Kumar Gautam | 02-06-2023 | Completed |
398 | Conducting NDT on Revamping of Conventional Center at Orchid Lake Resort Umiam, Meghalaya, Directorate of Tourism, | Directorate of Tourism, Government of Meghalaya | 70,800.00 | Dr. C.Marthong and Dr. M.L.Patton | 05-06-2023 | completed |
399 | Testing of Flexural strength of Concrete beam samples for Airport Authority of India Shillong |
"M/S Surface Tech India Pvt Ltd, Guwahati 781001, Assam GSTIN: 17AAHCS4907J1Z3 Client: Airport Authority of India Shillong" |
4,000.00 | Dr. Pradeep Kumar Gautam | 24-06-2023 | completed |
400 | Conducting Mix design for NIPANI Infra & Industries Pvt. Ltd. (BCCI Cricket ground at Madan Kurkalang, Meghalaya) |
"NIPANI Infra & Industries Pvt. Ltd. (Ref. No.: NIIPL/2023-24/1101 Date: 14-06-2023)" |
53,336.00 | Dr. C.Marthong | 04-07-2023 | completed |
401 | Vetting of DPR “Development of Hotel Block at Nongmahir New site, Ri Bhoi District” Meghalaya | Directorate of Tourism, Govt. of Meghalaya | 14,16,000.00 | Dr. C.Marthong, Dr. M.L.Patton, Dr. H.M. Kalita, Dr. D.K.Sarma | 19-07-2023 | Ongoing |
402 | Vetting of DPR for "Developement of Mawrah Village" Meghalaya | Directorate of Tourism Department, Govt. of Meghalaya | 25,20,662.57 | Dr. C.Marthong, Dr. D.K.Sarma | 20-07-2023 | Ongoing |
403 | Vetting of Architectural and Structural drawings of buildings items (Trep) of the proposed MLCU permanent campus at Umphyrnai. | MARTIN LUTHER CHIRISTIAN UNIVERSITY SHILLONG | 16,36,318.39 | Dr. C.Marthong and Dr. M.L.Patton | 14-08-2023 | Ongoing |