Sl. No. | Name of the PI/CoPI | Name of the Consultancy | Year | Cost in Lakhs | Agency | Sanction letter No. and date |
1. | Dr. D.K. Sarma and Dr. C. Marthong | Concrete Mix Design for construction of NIT Meghalaya, permanent campus at Sohra (First phase | 2014 | 1,10,000 | RITES, Gurgoan | |
2. | Dr. D.K. Sarma and Dr. C. Marthong | Concrete Mix Design for construction of NIT Meghalaya, permanent campus at Sohra (Second phase) | 2015 | 1,00,000 | RITES, Gurgoan | |
3. | Dr. D.K. Sarma and Dr. C. Marthong | Third party quality Control/Assurance in various project of CPWD, Shillong (First Phase) | 2015 | 2,26,452 | CPWD, Shillong | |
4. | Dr. D.K. Sarma and Dr. C. Marthong | Third party quality Control/Assurance in various project of CPWD, Shillong (Second Phase) | 2016 | 1% of project cost | CPWD, Shillong | |
5. | Dr. D.K. Sarma and Dr. C. Marthong | Testing of angle section and barbed wire for providing overhanging wire fencing at Shillong Airport | 2015 | 25,000 | Airport Authority of India, Shillong | |
6. | Dr. D.K. Sarma and Dr. C. Marthong | Material testing | 2016 | 1,74,000 | CPWD, Shillong | |
7. | Dr. D.K. Sarma | Material Testing | 2017 | 40,850 | State Investment Programme Management & Implementation Unit, Govt. of Meghalaya | |
8. | Dr. D. K. Sarma | Testing of anodic coating of aluminium section | 2017 | 11,800 | CPWD Shillong | |
9. | Dr. D. K. Sarma | Testing of materials | 2017 | 26,550 | RITES Ltd., Shillong | |
10. | Dr. D. K. Sarma | Testing of materials | 2017 | 56,640 | PWD(B), Meghalaya | |
11. | Dr. D. K. Sarma | Testing of materials | 2017 | 37,800 | St. Terasa Int. School, Shillong | |
12. | Dr. D. K. Sarma | Testing of Materials | 2018 | 1,48,680 | CPWD Shillong | |
13. | Dr. D. K. Sarma | Testing of anodic coating of aluminium section | 2018 | 23,600 | RITES Ltd., Shillong | |
14. | Dr. D. K. Sarma | Testing of materials | 2018 | 55,460 | RITES Ltd.,, Shillong | |
15. | Dr. D. K. Sarma | Testing of materials | 2018 | 36,580 | Mr. C. Swakmie, Shillong | |
16. | Dr. D. K. Sarma | Third party inspection of JCB | 2018 | 87,000 | State Investment Programme Management & Implementation Unit, Govt. of Meghalaya | |
17. | Dr. D. K. Sarma | Material Testing | 2018 | 47,790 | State Investment Programme Management & Implementation Unit, Govt. of Meghalaya | |
18. | Dr. D. K. Sarma | Testing of materials | 2018 | 37,760 | CPWD, Shillong | |
19. | Dr. D. K. Sarma | Testing of materials | 2019 | 1,72,280 | MPWD, Shillong | |
20. | Dr. D. K. Sarma | Testing of materials | 2019 | 56,640 | B.D. Marbeniang, Shillong | |
21. | Dr. D. K. Sarma | Testing of materials | 2019 | 47,200 | NITM boundary wall, Shillong | |
22. | Dr. D. K. Sarma | Testing of materials | 2019 | 2,97,360 | CPWD, Shillong | |
23. | Dr. D. K. Sarma | Testing of materials | 2019 | 77,880 | M/s Rishen Rapsang, Shillong | |
24. | Dr. D. K. Sarma | Testing of materials | 2020 | 4,15,360 | CPWD, Shillong | |
25 | Dr. R.N. Mahapatra | Work Time Motion Study | 2018 | 15.93 Lakhs | State Rural employment Society,Meghalaya | |
26 |
Prof. H.C. Das, Prof. B.B. Biswal Dr. B.K. Debnath |
Technical study of firing and combustion of the blended coal in pulverized coal fired subcritical boilers (135 MW and 600 MW) and identification of ill effects (if any) through three dimensional CAD modelling and computational fluid dynamics simulation | 2018 | 20.00 |
M/S Vedanta Limited, Aluminium & Power |
6600011480 Date: 19.09.2018 |
27 |
Prof. H.C. Das, Prof. B.B. Biswal |
Technical study for combustion of coal and Pet coke fired circulating fluidized bed combustion boiler | 2018 | 05.00 | ACC Limited & Ambuja Cement Limited |
1200728171/1/N216 Date: 25.10.2018 |
28 |
Prof. H.C. Das, Dr. M.L. Patton |
|
2018 | 03.00 | M/S.EMAMI Paper Mills. |
9600004241 Date: 01.12.2018 |
29 |
Prof. H.C. Das, Prof. B.B. Biswal |
Technical Study and Vetting of Combustion of Blast Furnace Gas and Coal in a Bubbling Fluidized Bed Combustion Boiler through Three Dimensional CAD Modeling and Computational Fluid Dynamics Simulation | 2018 | 12.00 | Jindal Steel & Power Limited |
4561528282 Date: 14.12.2018 |
30 |
Prof. H.C. Das, Dr. M.L. Patton |
Vetting of the design for the erection and launching scheme of a bowstring girder of 48m length submitted by the designer MIS Unycad Solutions, Ghaziabad, UP |
2019 | 1.40 |
M/S Kamalakanta Engineering & Construction Company Private Limited |
Date: 25.10.2019 |