Mechanical Engineering

Head of Department

Dr. Koushik Das
Ph.D (IIT Guwahati)

E-mail:
hod.me@nitm.ac.in

Sponsored Projects

Sl. No. Name of the PI/CoPI Name of the Consultancy Year Cost in Lakhs Agency Sanction letter No. and date
1. Dr. D.K. Sarma and Dr. C. Marthong Concrete Mix Design for construction of NIT Meghalaya, permanent campus at Sohra (First phase 2014 1,10,000 RITES, Gurgoan  
2. Dr. D.K. Sarma and Dr. C. Marthong Concrete Mix Design for construction of NIT Meghalaya, permanent campus at Sohra (Second phase) 2015 1,00,000 RITES, Gurgoan  
3. Dr. D.K. Sarma and Dr. C. Marthong Third party quality Control/Assurance in various project of CPWD, Shillong (First Phase) 2015 2,26,452 CPWD, Shillong  
4. Dr. D.K. Sarma and Dr. C. Marthong Third party quality Control/Assurance in various project of CPWD, Shillong (Second Phase) 2016 1% of project cost CPWD, Shillong  
5. Dr. D.K. Sarma and Dr. C. Marthong Testing of angle section and barbed wire for providing overhanging wire fencing at Shillong Airport 2015 25,000 Airport Authority of India, Shillong  
6. Dr. D.K. Sarma and Dr. C. Marthong Material testing 2016 1,74,000 CPWD, Shillong  
7. Dr. D.K. Sarma Material Testing 2017 40,850 State Investment Programme Management & Implementation Unit, Govt. of Meghalaya  
8. Dr. D. K. Sarma Testing of anodic coating of aluminium section 2017 11,800 CPWD Shillong  
9. Dr. D. K. Sarma Testing of materials 2017 26,550 RITES Ltd., Shillong  
10. Dr. D. K. Sarma Testing of materials 2017 56,640 PWD(B), Meghalaya  
11. Dr. D. K. Sarma Testing of materials 2017 37,800 St. Terasa Int. School, Shillong  
12. Dr. D. K. Sarma Testing of Materials 2018 1,48,680 CPWD Shillong  
13. Dr. D. K. Sarma Testing of anodic coating of aluminium section 2018 23,600 RITES Ltd., Shillong  
14. Dr. D. K. Sarma Testing of materials 2018 55,460 RITES Ltd.,, Shillong  
15. Dr. D. K. Sarma Testing of materials 2018 36,580 Mr. C. Swakmie, Shillong  
16. Dr. D. K. Sarma Third party inspection of JCB 2018 87,000 State Investment Programme Management & Implementation Unit, Govt. of Meghalaya  
17. Dr. D. K. Sarma Material Testing 2018 47,790 State Investment Programme Management & Implementation Unit, Govt. of Meghalaya  
18. Dr. D. K. Sarma Testing of materials 2018 37,760 CPWD, Shillong  
19. Dr. D. K. Sarma Testing of materials 2019 1,72,280 MPWD, Shillong  
20. Dr. D. K. Sarma Testing of materials 2019 56,640 B.D. Marbeniang, Shillong  
21. Dr. D. K. Sarma Testing of materials 2019 47,200 NITM boundary wall, Shillong  
22. Dr. D. K. Sarma Testing of materials 2019 2,97,360 CPWD, Shillong  
23. Dr. D. K. Sarma Testing of materials 2019 77,880 M/s Rishen Rapsang, Shillong  
24. Dr. D. K. Sarma Testing of materials 2020 4,15,360 CPWD, Shillong  
25 Dr. R.N. Mahapatra Work Time Motion Study 2018 15.93 Lakhs State Rural employment Society,Meghalaya  
26 Prof. H.C. Das,
Prof. B.B. Biswal
Dr. B.K. Debnath
Technical study of firing and combustion of the blended coal in pulverized coal fired subcritical boilers (135 MW and 600 MW) and identification of ill effects (if any) through three dimensional CAD modelling and computational fluid dynamics simulation 2018 20.00 M/S Vedanta Limited,
Aluminium & Power
6600011480 Date: 19.09.2018
27 Prof. H.C. Das,
Prof. B.B. Biswal
Technical study for combustion of coal and Pet coke fired circulating fluidized bed combustion boiler 2018 05.00 ACC Limited & Ambuja Cement Limited 1200728171/1/N216 Date:
25.10.2018
28 Prof. H.C. Das,
Dr. M.L. Patton
  1. Submission of a report on the cause of failure of Bunker.
  2. Vetting of structural design of the Coal Bunker
2018 03.00 M/S.EMAMI Paper Mills. 9600004241 Date:
01.12.2018
29 Prof. H.C. Das,
Prof. B.B. Biswal
Technical Study and Vetting of Combustion of Blast Furnace Gas and Coal in a Bubbling Fluidized Bed Combustion Boiler through Three Dimensional CAD Modeling and Computational Fluid Dynamics Simulation 2018 12.00 Jindal Steel & Power Limited 4561528282 Date:
14.12.2018
30 Prof. H.C. Das,
Dr. M.L. Patton
Vetting of the design for the erection and launching
scheme of a bowstring girder of 48m length submitted by
the designer MIS Unycad Solutions, Ghaziabad, UP
2019 1.40 M/S Kamalakanta Engineering &
Construction Company Private Limited
Date:
25.10.2019